Laserfiche WebLink
D. LOADING OUT FROM RAW MATERIAL STOCXPILE: <br /> Method of loading out (front-end loader, conveyor, etc. ) <br /> Loading schedule: tons/hour hours/day days/year <br /> Proposed controls for loading to stockpile: - <br /> controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) <br /> VI. PROCESSING <br /> Will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> ❑ Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIP14ENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEX (SEPARATE FORM IS ATTACHED AT END OF. THS FORM - MARE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by: <br /> Conveyor Front end loader x Other <br /> ® CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This .equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRUSHING <br /> Maximum tons crushed per year 50,000 tons. <br /> Maximum tons crushed per hour 300 tons. <br /> Hours of crushing per day 10 hours. <br /> Proposed controls (see above) spray bars <br /> H. SCREENING/CLASSIFYING <br /> Maximum tons screened per year 20,000 tons. <br /> Maximum tons screened per hour 150 tons. <br /> Hours of screening per day 10 hours. <br /> Proposed controls (see above) spray Bars <br /> oC. SECONDARY CRUSHING <br /> Maximum tons crushed per year 50,000 tons. <br /> Maximum tons crushed per hour 300 tons. <br /> Hours of crushing per day 10 hours. <br /> Proposed controls (see above) spray Bars <br /> 5 <br />