Laserfiche WebLink
VIII. FINISHED PRODUCT <br /> A. LOADING INTO FINISHED PRODUCT STOCKPILE <br /> Method of loading in (front-end loader, conveyor, etc. ) <br /> Front End Loader, Stacking Conveyor <br /> If conveyor is used, what is maximum drop height? ft. <br /> Loading schedule: 200 tons/hour it hours/day , in days/year <br /> Proposed controls Water Truck and reduced drop heights <br /> Controls for loading to stockpile include : other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical suppressants, <br /> reduced drop height, telescoping chute <br /> B. FINISHED PRODUCT STOCKPILE <br /> Maximum tons stored at one time 10,000 tons. <br /> Length of time pile remains undisturbed i year <br /> Proposed controls: (check appropriate boxes) <br /> ❑ Watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (applied according to manufacturer' s <br /> specifications). <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Revegetation, (length of time till revegetation ) <br /> ❑ other (specify) <br /> No control <br /> C. LOADING OUT FROM STOCKPILE FOR FINAL TRANSPORT <br /> Method of loading out (front-end loader, conveyor, etc. ) <br /> Front End Loader <br /> If conveyor is used, what is maximum drop height? ft. <br /> Loading schedule: 150 tons/hour in hours/day 130 days/year <br /> Proposed controls Water Truck <br /> Controls for loading out of stockpile include Water injection, <br /> chemical dust suppressants, bag collectors, other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical suppresants, <br /> reduced drop height, telescoping chute. <br /> 7 <br />