Laserfiche WebLink
* V. RAW MATERIAL <br /> A. REMOVAL <br /> OTHER <br /> MATERIAL ROCK COAL <br /> IMa <br /> ns removed per year <br /> ximumm tons removed per day <br /> Equipment used for removal <br /> Equipment capacity (in tons) <br /> Est. hours per year required for removal <br /> Is material dU, moist, or wet? <br /> Specify moisture content if known (t) <br /> H. LOADING IN TO RAW MATERIAL STOCKPILE <br /> QMethod of loading in (truck bottom dump, front-end loader, etc. ) <br /> Loading schedule: tons/hour hours/day days/year <br /> Proposed controls for loading to stockpile: <br /> Controls include: no control, water sprays, total enclosure, partial <br /> enclosure, chemical suppressants, reduced drop height, telescoping <br /> chute, other (specify) <br /> C. RAW MATERIAL STOCKPILE <br /> OTHER <br /> MATERIAL ROCK COAL <br /> Maximum tons stored at any one time <br /> Length of time pile remains undisturbed <br /> Proposed controls for raw material stockpile: (check appropriate boxes) <br /> ❑ watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (Type: ) • <br /> O ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Other (specify) <br /> ❑ No control <br /> * Raw Material will be mined and fed directl4y into processing equipment. <br />