<br /> <br />2.05.4~2)(b) Reclamation Cost Estimates. continued) <br />sediment pond dam. <br />Topsoil replacement and redistribution is to concur with stripping other than the 4,000 yards <br />stockpiled. This is to be replaced at the end of Phase 1 or 2 pits, preferably the second pit. <br />Moved by scraper/dozer or truck/shovel at 4000 yards @ 1.40625 a yard <br />$ 5,625.00 <br />Preparation of topsoil for seeding (i.e. leveling, although most will be completed during the <br />mining Phase). <br />15.76 acres at $ 200.00 an acre <br />$ 3,152.00 <br />Revegatation costs 15.76 acre at $ 550.00 acre <br />$ 8,668.00 <br />An area measuring 800 x 200 = 3.67 acre may require hydro mulching in post mining <br />configuration of topo shown on Map No. 7 because of steepness of grade. <br />3.67 x $ 200 = $ 734.00 <br />Worse case scenario in mining operation would result in abandonment during the Phase 2 <br />mine operation which would leave a large open pit area with a steep high wall in a confined <br />area. <br />Cost would be for leveling spoil and grading. <br />_ ~ <br />150'x 200'x 40' av/27=44, 444 cu. yds. x .9799 = $ 43,551.00 <br />Total reclamation cost $ 61,730.00 <br />-2- <br />1 ~~~~ <br />~F~l <br />I <br />€.. <br />