• 2.05.4(2) Reclamation Cost Estimates (continued) <br />As of the end of 1995, only 11.12 acres were disturbed and all except for 1.2 acres of <br />the sediment pond and dam and 0.37 acres for the access road were reclaimed. These <br />structures are to remain. <br />The original bond of $62,000 was reduced in 1994 due to a Phase 1 release of $31,000. <br />As of the end of 1995, the current bond is $31,000 through Corporate Surety No. <br />124169933. <br />The Division has re-calculated the remaining costs for reclamation at the mine in <br />October of 1995. This cost estimate totaled to $15,260. Since this cost does include the <br />cost of removing the sediment pond and since the actual bond held is much higher due <br />to the mine closing before full disturbance was~ealized, Rimrock may seek a bond <br />reduction during the next permit term. <br />The updated Division reclamation cost summary calculations are included in the <br />following pages. The detailed cost estimates, as well as the original bond summary <br />costs, are included in Exhibit SS. <br />• <br />-3- <br />• Revised for permit renewal 11/17/95 <br />