My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101494
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:45 PM
Creation date
11/24/2007 7:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 50 Supplemental
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_, i <br />A report containing the results of our evaluation of the • <br />applicability of the Mid-Continent study to Mt. Gunnison <br />and the ERT study as well as an analysis of the refuse <br />I <br />material itself together with WECC's recommendation for <br />suitable cover depth will be submitted to the CMLRD for <br />its evaluation. The report will be submitted to the CMLRD <br />within six months. Until such time as the variance f <br />request is approved, WECC will commit to covering the <br />refuse pile with four feet of non-toxic cover material. <br />As described in Section 5 under Reclamation and Bonding of <br />the original application, WECC, in its 1981 Topsoil <br />Assessment, determined that there was seedbed quality ~ <br />material present in the refuse disposal area well in <br />excess of that necessary for reclamation, using four feet ~ <br />of cover. Furthermore, as indicated in Section 5, the 1 <br />seedbed quality material removed prior to commencement of <br />construction on the first stage of the refuse pile will be <br />I <br />stockpiled on the east end of the refuse disposal area as <br />shown in Drawing 001 of that application. <br />8.1.2 Collection Ditches <br />Upon reclamation, all surface water collection ditches <br />will be removed and the area reclaimed in accordance with <br />Section 4.4 of the Mt. Gunnison M and R Plan. <br />Revegetation success will be measured in accordance <br />-35- <br />
The URL can be used to link to this page
Your browser does not support the video tag.