Laserfiche WebLink
• with Section 4.6 of that Plan. The only ditch which will <br />remain open following reclamation of the minesite will be <br />the upland diversion ditch. This ditch will continue to <br />divert upland runoff away from the pile for discharge into <br />the gulch to the west. <br />8.1.3 Access Road <br />As surface owner, Atlantic Richfield intends to keep the <br />road open for use as access to the grazing areas in the <br />vicinity of the refuse pile, thus no reclamation of the <br />road is proposed. <br />i • <br />8.2 Bonding <br />Bonding calculations have been revised to reflect <br />revisions made to the original design of the pile and <br />access road. Thus, this bond calculation replaces the <br />calculation presented in the original application. <br />Except where noted, reclamation costs were determined <br />using the calculations and assumptions used in Tables <br />4.S.1.A (revised March, 1984) and 4.8.1.C (revised March, <br />1984) of the Mt. Gunnison M and R Plan. <br />I. <br />-36- <br />