My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101494
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:45 PM
Creation date
11/24/2007 7:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 50 Supplemental
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For general reference, sequential cover and required area of • <br />stripping are tabulated below assuming a maximum of four (4) <br />feet of cover. <br />Area Approximate Approximate <br />To be Covered Q uantity of Cover Area to be Stri ed <br /> Cu. s. Gres <br />Stockpile 72,000 10.0 <br />Toe to 6710' 34,000 4.5 <br />6710` to 6760' 59,000 8.0 <br />6760' to 6810' 63,000 9.7 <br />6880' to 6835' 52,000 7.8 <br />6835' to 6880' (From Stockpile) -0- <br />TOTAL: ~ Acres <br />3.3 Surface Drainage Channels <br />Surface drainage channels will consist of: (1) Perimeter <br />drainage channels along the east and west toes of the refuse • <br />pile, (2) temporary collection channels above the refuse <br />pile, and (3) collection channels located southeast and <br />southwest of the refuse pile. The existing diversion channel <br />north of the refuse area will serve as a collection channel, <br />whereas the existing channel located south of the final <br />refuse disposal plan will remain as a permanent diversion <br />channel. Hydrologic and hydraulic design criteria for these <br />channels has been presented in Section 4.0 of this report. <br />Initially, the perimeter and temporary channels will be con- <br />structed as shown on Drawing No. MG-R-C-002. All- perimeter <br />channels and the southeast and southwest collection channels <br />on the refuse pile will be riprapped with hard, durable, non- • <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.