My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101494
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101494
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:45 PM
Creation date
11/24/2007 7:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 50 Supplemental
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />intent of WECC to determine the amount of non-toxic cover <br />required for successful revegetation based upon studies done <br />at other western mining operations having similar conditions <br />and if necessary by trial revegetation plots utilizing <br />various non-toxic cover thicknesses to a maximum of four (4) <br />feet. Therefore, the initial stripping will be to a depth of <br />four and one-half (4.5) feet. This will assure that four (4) <br />feet of non-toxic cover will be available for final pile <br />reclamation should the studies or the test plots indicate <br />this depth is necessary. <br />The initial quantity of approximately 70,000cubic yards of <br />• topsoil and subsoil will be stockpiled in an area just east <br /> of the refuse disposal facility as shown on Drawing No. 001, <br />Sheet 1 of 2 (1). All future stripped material will be used <br />in contemporanious reclamation of the completed refuse pile <br />outslopes. In order to reclaim the outslope up to and in- <br />cluding the first bench, approximately 34,000 cubic yards of <br />cover will be needed for four (4) feet of depth. This will <br />necessitate the stripping of a maximum of 4.5 acres for con- <br />temporaneous reclamation in the second stripping operation. <br />The stripping will continue as required for pile reclamation <br />material and as the disposal area expands. <br />• <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.