Laserfiche WebLink
<br />Except for the access road construction, all of the above • <br />operations will continue as the refuse pile advances. <br />1 <br />3.1 Access Road Construction <br />., <br />l <br />An access road to be used to transport the refuse by truck <br />will be constructed on the west side of the refuse disposal <br />area. The access road surface will be constructed using <br />on-site, hard, durable, crushed rock. Suitable off-site <br />material will be used if on-site material is not suitable. <br />Detailed design of the access road is presented in Section -~ <br />7.0 of this report. Portions of the excavated rock material 1 <br />I <br />will be utilized as base course for the access road and the • <br />construction of underdrains. The remaining material will be <br />_, <br />stockpiled near the western limit of the refuse area for <br />future use in reclamation. <br />i <br />3.2 Clearing and Stripping -' <br />I <br />_.l <br />Initially approximately 10 acres will be cleared and strip- <br />ped, maintaining a buffer zone of twenty (20) feet beyond the <br />fill placement limit and undisturbed ground. <br />The depth of topsoil and subsoil removed will depend on the <br />volume of cover required for final reclamation. It is the <br />• _. <br />5 I <br />