Laserfiche WebLink
4.02.5 Stream Buffer Zone P1arkers <br />• No buffer zone markers as required under the provisions of Section <br />4,05.18 will be required. <br />4.02.6 Blasting Signs <br />Peerless Resources will not conduct any surface blasting as part of its <br />planned underground operations. Therefore, no blasting signs need to be <br />posted at the operation. <br />4.02.7 Topsoil Markers <br />THe area of surface facilities has been previously affected by past <br />underground mining activities prior to any laws and regulations; <br />therefore, no topsail or soil material has ever been salvaged. If any <br />soil material is moved incidental to ongoing operations, Peerless <br />Resources will clearly mark all stockpiled topsoil with signs reading, <br />"Topsoil, Keep Off". <br /> <br />4.02-2 <br />