Laserfiche WebLink
<br />AREA E19 (0.69 ACRES): <br />Location: Immediately west of area E5. <br />Condition: Contains the access road to Area E9 and a soil stockpile <br />(volume = 350 yd~). <br />Future Reclamation: Would become part of pit reclamation plan. <br />Current Reclamation: Rip the roadway, distribute the soil on the roadway <br />and adjacent disturbances, and revegetate. <br />Disturbance Reduction Program: Not included. <br />AREA E15 (0.19 ACRES): <br />Location: Pdjacent to Area E3 (immediately south). <br />Condition: Contains a narrow, one lane, poorly built access road. <br />Future Reclamation: Would become part of pit reclamation plan. <br />urrent Reclamation: Rip surface and revegetate. <br />Disturbance Reduction Program: Included and will be done along with Area <br />E3. <br />AREA E16 (1.9 ACRES): <br />Location: Connected to Area E7. This is the most easterly disturbance <br />on the site. <br />Condition: A series of low piles designed to protect the irrigation <br />ditch from runoff and formerly to prevent vehicular access by trespassers to <br />the ditch property. <br />Future Reclamation: Would become part of pit reclamation plan. <br />Current Reclamation: Smooth irregular form of piles and revegetate. <br />Disturbance Reduction Program: Included. <br />AREA E17 (5.6 ACRES): <br />Location: Avery long berm extending along part of the permit boundary <br />primarily just south of Drennan Road. <br />Condition: Largely vegetated linear mound of dirt designed to screen <br />the property from the north (volume = 6,450 yd3). <br />Future Reclamation: Remove upon comQletion of pit. <br />Current Reclamation: Knock down the berm and produce a low, linear <br />hillock, revegetate. <br />Disturbance Reduction Program: Not included. <br />SUMMARY <br />Total area included in these discussions = 176.39 <br />Total area needing topsoil, as available, and revegetation = 160.56 acres. <br />Total volume of soil/overburden on site = 109,665 yd3 <br />Maximum expected volume of product/waste = 31,000 yd3 <br />(Note: waste is piled waste and does not include <br />sediment basin waste which would not be moved anyway.) <br />For a complete sumrary of this information, please refer to the spreadsheet <br />surmiary on an area by area basis included at the end of this material. <br />Page 15 Bonding Information M-73-007/M-77-213 January 7, 1992 <br />