My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101108
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:31 PM
Creation date
11/24/2007 7:37:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
4/24/2006
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estlmatinst Software <br />COMPACTION WORK <br />;: . <br /><: <br />PROJECT IDENTIFICATION <br />Task # : 005 State : Cdoredo Pennifrob # : C-1983-059 <br />Date: 22-Feb-2006 <br />User : JRS <br />County :Delta <br />Site :Terror Creek Loadout Filename : C059-005 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :2006 Midterm Review <br />Task description : CompaM Coal Mat'e-lal in On-Site <br />HOURLY EQUIPMENT COST <br />Compactor type :Pad Foot <br />Area <br />Horsepower: 220 <br />Shift basis : 1 per day <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $47.73 NA <br />Operating cosUhcur : $46.78 10YJ <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : $126.29 Total fleet cosUhour : $126.29 <br />., ,- <br />. .., :, <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 9,559 LCY factor : 0.870 volume : 8,316 CCY <br />Source of estimated volume :Map 5 -Assume 1' Over 5 Acres <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly~roduction = (W x S x L x C1 / P <br />Compacted width per pass (V1n <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted houdy unit production <br />Job Condition Correction Factors <br />Site attitude : 5, 800 feet <br />Abbreviation :none <br />6.42 feet <br />5.00 mph <br />12.00 inches <br />18.3 (5,280 ft./12 in./27 cu.ft.) <br />5 passes <br />1,255.75 CCY/hr <br />Altitude adjustment factor <br />Job efficiency tailor <br />Net job correction <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size <br />Machine descdption :CAT 815E <br />compactor(s) <br />Unit wst : $0.121 per CCY <br />Total job time <br />Total job cost <br />Source <br />1.00 (Cat HB) <br />0.83 (1 shilt/day) <br />0.83 multiplier <br />1,042.27 CCYIhr <br />1,042.27 CCY/hr <br />7.98 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.