Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />,.. <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />OOB State :Colorado <br />0222/1006 <br />JRS <br />County :Delta <br />Site :Terror Creek Loadout <br />Pennif<ob # : C-1983-059 <br />Abbreviation :none <br />Filename : C059-006 <br />Agenq or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description :Rip Light-Use Road, Wafer Tank, RR Track and Haul Road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.04 NA <br />Dozer operating cosUhour : $93.47 100 <br />Ripper operating cosUhour : $9.00 100 <br />Operator cosUhour : $31.78 NA <br />Total unit cost/hour : $185.30 Total fleet cosUhour : x185.30 <br />MATERIAL QUANTITIE <br />Alternate methods - <br />Seismic : NA <br />Area : 0.80 <br />Selected estimating method : Area <br />NA Load factor <br />acres Rip depth (ft) <br />NA Bank volume : NA BCY <br />2.00 Volume : 2,581 BCY or CCY <br />Source of estimated quantity :Map 5 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - ~ ob Condition Correction F ctors - <br />Seiamic : Seismic velocity : NA feeUsewnd Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 3,553.84 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.63 feeUpass Site altitude : 5,800 feet <br />Average ripping width : 7.67 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feeUpass Jab efficiency factor : 0.83 (1 shiR/day) <br />Average dozer speed : 88.00 feet/minute Netjob correction : 0.83 multiplier <br />Average maneuver time : 0.25 minuteslpass <br />Production per unit area : 0.838 acres/hour Adjusted unit production : 2,949.69 cu. yds.Rrour <br />Unadjusted production : 3,553.84 cu. yds./hour Adjusted fleet production : 2,949.69 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 0.88 hours <br />Unit oust : $0.063 per cu. yd. Total job cost : x182 <br />