My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101108
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:31 PM
Creation date
11/24/2007 7:37:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
4/24/2006
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating SoTtware <br />Task #: 003 <br />Date: 02/222006 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permlt or other job action :2006 Midterm Review <br />Task description :Move Sediment Storage Pile for On-Site Disposal <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : i per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership costmour : $51.01 NA <br /> Operating cosfmour : $93.55 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator costmour : $31.78 NA <br /> Total unit casUhour : $178.34 Total fleet cosUhour : $176.34 <br /> <br />,. ; <br />MATERIAL QUANTITIES : > ,. <br />Initial Swell Loose <br />volume : 1,500 CCY factor : 1.125 volume : 1,688 LCY <br /> <br />Source of estimated volume :Map 5 and Page 2.05-3 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 700.0 LCYmr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/day) <br />Consolidated stockpile Spoil pile : 0.90 (ssd-/c) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5, 800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production <br />Adjusted fleet production <br />353.60 <br />353.60 <br />LCYmr <br />Lcvmr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.77 Houra <br />Unit cost : $0.499 /LCY Total job cost : $842 <br />State :Colorado <br />Courtly :Delta <br />Site :Terror Creek Loadout <br />Penn~ob#:C-1983-059 <br />Abbreviation :none <br />Filename : C059-003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.