Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 02222008 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Terror Creek Loadout <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost hour : $51.01 NA <br />Operating cost/hour : $93.55 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator costAiour : $31.78 NA <br />Total unit cost/hour : $176.34 Total fleet cosUhour : $178.34 <br /> <br />::: _ , <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 38,000 CCY factor : 1.125 volume: 42,750 LCY <br /> <br />Source of estimated volume :Maps 5, 12 and 13 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCYRtt <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site attRude <br />10.00 % (pos, <br />5, 800 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Pennitlobte : C-1983-059 <br />Abbreviation :none <br />Filename : C059-002 <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Vsibilily : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiB/day <br />Spoil pile : 0.80 ((nd-rfJ <br />Push gradient : 0.79 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weigh : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.31 <br /> <br />Adjusted unit production : 214.16 LCY/hr <br />Adjusted fleet production : 214.16 LCYIhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 199.81 Hours <br />UnR cost : $0.823 /LCY Tatal job cost : $35,201 <br />