My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCE5 Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Tasx # : 037 <br />Date : 09/272008 <br />User: TAK <br />Permivjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-037 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Regrade all sediment ditches <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Machine description : Caf 330C L <br />Cost Breakdown . Utilization °ii, <br />OwnershipcosUhour : $46.3t NA <br />OperatingcosUhour : $58.15 100 <br />OperatorcosUhour : $32.96 NA <br />TotaY unit cosUhour : $137.42 <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Shift basis: 1 perday <br />Data source ; (CRG) <br />Total fleet cosUhour ; $137.42 <br />MATERIAL QUANTITIES <br />Initial Swell loose <br />volume : 273 CCY factor : 1.165 volume : 318 LCY <br />Source of estimated volume :Map 54, Table 44 and Exhibit 66 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dumo bucket swino emori) <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.39 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) <br />Bucket fill factor : 0.85 Hard, tough clay <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors <br />Site altitude : 6,300 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly Fleet production <br />Bucket size Gass : medium <br />Source <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shitUday) <br />Net job correction : 0.83 multiplier <br />294.23 LCYlhour <br />244.21 LCY/hour <br />244.21 LCY/hour <br />JOB TIME AND COST <br />Fleet size : i excavator(s) Total job time : 1.30 hours <br />Unit cost : $0.563 per LCY Total job cost : $179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.