Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name :CDRMS <br />038 State :Colorado <br />01/19/2007 County :Gunnison <br />TAK Site :West Elk Mine <br />sheet 1 of 2 <br />PermiUjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-038 <br />Permit or other job action : Pemtrt Renewal RN-05 <br />Task description :Haul Bear Mine area riprap stockpile to base of fill <br />HOURLY EQUIPMENT COST ~~ Shift basis: ~~~l per day ~~~ <br />Truck/loader team -Truck :~Genenc 10-12 cy, 6x4 <br />-Loader :CAT 966G high IiR (2002) <br />Suppon equipment -Load area :Cat D9R - 9U (2005) <br />Road maintenance -Motor grader <br />-Water truck <br />9SU <br />Cost Breakdown : ruck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />%Utilization-machine: 99 100 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost hour: $11.86 $29.75 $65.09 $64.72 NA NA <br />Operating cost hour: $40.62 $38.33 $99.23 $98.84 NA NA <br />Ripper op. cosUhour: NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals: $74.22 $100.85 $19710 $196.34 NA NA <br />Number of units : 2 1 1 1 0 0 <br />Group subtotals : Work : $249.30 Support : $393.44 Maintenance : $0.00 <br />Total work team crosf/hour : $642.74 <br />MATERIAL QUANTITIES <br />Inifial <br />volume: 1,852 LCY <br />Swell Loose <br />factor: NA volume <br />Source of quantity take-off :Division estimate <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY <br />Total cost <br />1,852 LCY <br />$0 <br />Truck CaoaciN <br />Truck Payload (weight) Basis : Truck Betl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Sandstone Heaped volume : 1200 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 13.88 LCY Adjustetl volume': 12.00 LCY <br /> Final truck volume based on number of loader passes : 11.88 LCY <br /> 'truck volume adjusted m not exceed rated pey~oad or heaped volume <br />Loading Tool CaoaciN : Job Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCV Truck Loader Source <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 0.920 (Cat HB <br />Bucket fill factor : 0.500 Job efficiency : 0.830 0.830 (1 shik/da <br />Adjusted bucket capacity : 2.375 LCY Net cerrection : 0.830 0.764 <br />