CIRCES Cost Estimatinn Software <br />PROJECT IDENTIFICATION <br />Task # : 036 <br />Date : 09/27/2006 <br />User : TAK <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Permitfjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-036 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other jab action :Permit Renewal RN-05 <br />Task description : Regrade Diversion Difches DCW-1A, DCW-16, and D1-6 <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L Horsepower : 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $46.31 NA Shift basis : 1 per day <br />Operating cosUhour : $58.15 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cosUhour : $137.42 Total fleet cost/hour : $137.42 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,775 CCY factor : 1.165 volume : 3,233 LCY <br />Source of estimated volume :Map 54, Table 44 and Exhibit 66 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing emoN) <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description ; SEVERE <br />Cycle time value : 0.39 <br />minutes <br />Bucket Caoacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class ; medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.91 LCY <br />Fleet size : i excavator(s) Total job time : 13.24 hours <br />Unit cost : $0.563 per LCY Total job cost : $1,$19 <br />