My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br />File name. cost summary.zls <br />TASK LIST (DIRECT COSTSI <br />Task no. Task description Form Fleet <br />Used Size Task <br />Hours Direct Cost <br />170 Compact main access road Backfill material wmpact 9,45 $ 1,616 <br />171 Backfill intake an0 exhaust shafts from PR-07 dozer 0.20 $ 162 <br />172 Regrade road to drill hole #4 from MR-236 tlozer 0.51 $ 415 <br />173 Replace topsoil Vom stockpile to tlnll pad r74 from MR-236 tlozer 0.17 $ 137 <br />174 Regratle SGFA dewatering facility structures dozer 32.67 $ 26,731 <br />175 Replace topsoil from stockpile to SGFA dewatering facilities scraperi 4.45 $ 2,578 <br />176 Rip light use roads to power lines and switchgear dozer 0.14 $ 123 <br />177 Regrade access roatl to powerlines and switchgears dozer 1.65 $ 1,348 <br />178 Remove base from light use roads to powerline/swi[chgear scraped 0.62 $ 359 <br />179 Replace topsoil from stockpile to light use road for power poles 7 and scraped 0.21 $ 121 <br />180 Replace topsoil from stockpile to Vench drains and trenches scraperi 7.32 $ 4,240 <br />181 Haul subsoil from live subsoil pile #1 to CSLY-4 Excavation scraperi 2.63 $ 1,522 <br />182 Replace topsoil from stockpile to CSLY-4 Excavation scraperi 1.79 $ 1,037 <br />183 Replace topsoil from stockpile to roads and powerpoles 9-17 dozer 0.13 $ 106 <br />184 Rip dewatering borehole access roatl dozer 0.05 $ 44 <br />185 Rip dewatering borehole pad dozer 0.16 $ 131 <br />186 Regrade dewatering boreholes and access roads from MR-212 dozer 0.62 $ 509 <br />187 Regrade dewatering borehole tlrill pads from MR-212 dozer 8.91 $ 7,290 <br />188 Regrade mutl pits associated with MR-212 tlozer 0.16 $ 132 <br />189 Replace topsoil Vom stockpile to dewatering borehole road and pad scraperi 0.65 $ 380 <br />190 Remove roadbase from dewatering borehole road [o pad 0.17 $ 97 <br />191 Remove and replace topsoil to remove water pipe from MR-209 dozer 0.23 $ 191 <br />192 Regrade ROM expansion Area dozer 61.70 $ 50,477 <br />193 Compact backfilled material at ROM pile expansion 15.50 $ 2,649 <br />194 Replace topsoil from stockpile to ROM pad expansion 0.15 $ 125 <br />195 Regrade ditch DCW-7 17.26 $ 10.003 <br />196 Finish grade ROM pile expansion grader 1.92 $ 196 <br />197 Regrade access roads ssociatetl with MR-244 dozer 0.79 $ 643 <br />198 Replace topsoil Vom stockpile to access roads associated with MR-244 dozer 0.37 $ 302 <br />199 Haul fill Vom subsoil pile #1 to Vain Loadout pond MB-4 antl sed [rap loader 0.66 $ 571 <br />200 Regratle access roads ssociated with MR-247 dozer 0.36 $ 294 <br />201 Replace topsoil from stockpile to roads associated with MR-247 dozer 0.17 $ 140 <br />202-204 Task number not assigned $ - <br />205 Rip pads and roads ssociatetl with MR-267, 270, 273 and 275 dozer 7.26 $ 6,155 <br />206 Regratle tlnll pads and roads associated with MR-267, 270, 273 and 275 dozer 26.97 $ 22,064 <br />207 Replace topsoil on pads and roads Vom MR-267, 270, 273 and 275 dozer 9.75 $ 7,982 <br />208-220 Task number not assigned $ - <br />221 Regrade drill pads Vom MR-291 and 295 and TR-94 and 96 dozer 47.62 $ 38,960 <br />222 Regratle light use roatls from MR-291 and 295 and TR-94 antl 96 dozer 64.11 $ 52,452 <br />223 Replace topsoil Vom stockpile to drill pads from MR's antl TR's tlozer 17.61 $ 14,406 <br />224 Replace topsoil Vom stockpile to light use roads from MR's and TR's dozer 24.60 $ 20,128 <br />227 Task number not assigned $ - <br />228 Regratle MR-302 drill patls tlozer 21.58 $ 4,211 <br />229 Regrade MR-302 roads dozer 25.01 $ 4,911 <br />230 Replace topsoil from stockpile to MR-302 drill pads dozer 16.73 $ 3,218 <br />231 Replace topsoil Vom stockpile to MR-302 roads dozer 18.35 $ 3,753 <br />232-3 Task number not assigned $ - <br />234 Regrade drill pads for MDWS approvetl in MR-306 dozer 26.07 $ 5,333 <br />235 Regratle light-use roads approvetl in MR-306 dozer 34.77 $ 7,112 <br />236 Replace topsoil from stockpile to drill pads approvetl in MR-3D6 tlozer 7.68 $ 1,571 <br />237 Replace topsoil from stockpile to light-use approved in MR-306 dozer 10.04 $ 2,053 <br />238-9 Task number not assignetl $ <br />240 Regrade drill pads approvetl in TR-100 dozer 40.69 $ 8,323 <br />241 Replace topsoil Vom stockpile to tlnll pads approved in TR-100 13.78 $ 2,819 <br />242 Task number not assigned $ - <br />243 Backfill/regrade parking lot expansion tlozer 3.42 $ 700 <br /> SUBTOTAL 3066.77 $ 320.820 <br />
The URL can be used to link to this page
Your browser does not support the video tag.