My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br />File name: cost summary.xls <br />TASK LIST (DIRECT COSTS <br />Task no. Task description Form Fleet Task Direct Cost <br /> Used Size Hours <br />110 Compact RPE roatl backfill compact 2.78 $ 475 <br />111 Compact remaining coal on RPE compact 12.43 $ 2,125 <br />112 Regratle NNS area dozer 16.91 $ 13,836 <br />113 Regratle NNS pond dozer 0.40 $ 331 <br />114 Replace topsoil from stockpile to NSS area dozer 7.62 $ 6,238 <br />115 Haul cover material to RPE loader 107.54 $ 85,088 <br />116 Replace topsoil from stockpile [o RPE area loatler 50.70 $ 40,115 <br />117 Regrade mudpits for MR-214 holes (1-4) dozer 0.14 $ 112 <br />118 Regrade MR-214 drill pads tlozer 3.43 $ 2,802 <br />119 Regratle MR-214 roads dozer 1.39 $ 1,133 <br />120 Replace topsoil from stockpile to MR-214 pads, mudpits, and roads 1.56 $ 1,273 <br />121 Task number not assigned $ - <br />122 Backfill SGFA ventilation shaft #3 dozer 0.00 $ 3 <br />123 Replace topsoil from stockpile to shaft #3 pad and light-use road scrapers 15.06 $ 8,729 <br />124 Regrade shaft #3 pad and roads dozer 381.29 $ 311,943 <br />125 Compact backfilled material at shaft #3 pad and roads compact 156.06 $ 26,670 <br />126 Rip shaft #3 antl roatls dozer 1.26 $ 1,068 <br />127 Haul shaft #3 backfill from shafts #1 and #2 loader 566.23 $ 489,826 <br />128 Regratle MR-218 borehole access roads dozer 10.29 $ 8,418 <br />129 Regratle MR-218 drill pads dozer 1.52 $ 1,247 <br />130 Replace topsoil from stockpile to MR-218 roads and drill pads dozer 5.93 $ 4,848 <br />131 - 135 Tasks removed in TR-97 for plannetl facilities not constructed $ - <br />136 Pull Up material from Syl. Gulch light use road expansion excavate 26.33 $ 3,619 <br />137 Regratle material at Sylvester Gulch light use road expansion dozer 2.85 $ 2,335 <br />138 Replace topsoil from stockpile to fill side of light use roatl expansion scraperl 0.85 $ 492 <br />139 Compact backfill on witlenetl portion of Sylvester Gulch light use road compact 5.71 $ 975 <br />140 Replace topsoil from stockpile on tlrill pad in meadow above portals dozer 0.09 $ 72 <br />141 Haul Fill from RCC [o water tank topsoil keyway loader 21.82 $ 22,168 <br />142 Regratle water tank topsoil pile keyway material dozer 2.21 $ 1,807 <br />143 Compact fill replaced at water tank topsoil pile keyway compact 5.32 $ 908 <br />144 Replace topsoil from stockpile to water tank topsoil pile antl roatls dozer 3.14 $ 2,571 <br />145 Regrade light use roads for water tank topsoil pile dozer 0.67 $ 547 <br />146 Backfill cuttings into adtlitional methane hole at vent shaft #3 excavate 0.19 $ 25 <br />147 Regrade drill pads for MR-231 boreholes dozer 0.11 $ 93 <br />148 Regrade roads associated with MR-231 tlozer 1.10 $ 899 <br />149 Backfill/regrade DMEA powerline road dozer 0.30 $ 249 <br />150 Replace topsoil from stockpile to power pole roads 9 and 11-16 scraperl 0.61 $ 352 <br />151 Reseed RPE, haul road, NSS area and all SGFA facilities revege 193.74 $ 837,636 <br />152 Replace topsoil from stockpile to shaft site and electric borehole road loatler 129.81 $ 90,345 <br />153 Replace topsoil from stockpile #1 loader 32.54 $ 23,241 <br />154 Replace topsoil from stockpile #3 loader 110.79 $ 79,349 <br />155 Replace topsoil from stockpile #4 loatler 5.92 $ 5,464 <br />156 Replace topsoil from stockpile #5 loatler 0.42 $ 270 <br />157 Haul substation backfill material loader 9.12 $ 6,522 <br />158 Haul backfill material for main access road stations 58-92 loader 36.86 $ 23,478 <br />159 Regrade ventillation shaft site tlozer 82.88 $ 67,807 <br />160 Regratle light use roads from PR-07 dozer 33.95 $ 27,779 <br />161 Regrade main access road from stations 58-92 dozer 24.85 $ 20,332 <br />162 Regrade main road from stations 7-58 dozer 38.37 $ 31,393 <br />163 Regratle substation access road from PR-07 dozer 9.99 $ 8,177 <br />164 Rip all SGFA disturbance areas grader 22.30 $ 2,275 <br />165 Pull Up material for light use road reclamation excavate 108.77 $ 14,947 <br />166 Compact shaft backfill material compact 31.08 $ 5,312 <br />167 Compact substation backfill compact 2.49 $ 425 <br />168 Compact light use road material compact 20.65 $ 3,530 <br />169 Compact substaton road material compact 3.80 $ 650 <br />SUBTOTAL 2312.17 $ 2,292,324 <br />
The URL can be used to link to this page
Your browser does not support the video tag.