My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE101074
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE101074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:30 PM
Creation date
11/24/2007 7:33:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br />File name: cost summary.xls <br />TASK LIST (DIRECT COSTSI <br />Task no. Task description <br />50 Rip substation roatl <br />51 Regrade main access road to substation <br />52 Regrade hauVaccess road from HWY 133 to Sylvester Gulch fan roatl <br />53 Replace topsoil from stockpile to materials storage bench <br />54 Replace topsoil from stockpile #5 to MSB cut slope <br />55 Replace topsoil from stockpile #5 to west fill Area <br />56 Backfill portal access road <br />57 Haul coal at stack tube to refuse pile <br />58 Haul coal at Stack Tubes to refuse pile <br />59 Backfill and grade storage bench <br />60 Push cu[ material from west fill onto bench <br />61 Push Wes[ fill material to base of cut slope <br />62 Push fill material back onto cut slope <br />63 Move fill material from portal storage bench to base of cut <br />64 Move portal storage bench material onto cut slope <br />65 Compact replaced material at MSB excavation site <br />66 Rip storage bench access road <br />67 Backfill MB-1 and FW-1 <br />68 Rip truck pull-out land <br />69 Rip portal access road (east of portals) <br />70 Backfill storage bench access road <br />71 Rip materials storage bench <br />72-3 Task number not assignetl <br />74 Regrade ddll pads antl mud pits <br />75 Regrade drill roads <br />76 Replace topsoil from stockpile to patls, mud pits, and roads <br />77 Reseed borehole patls, access roatls, and other small areas <br />78 Rip patl and roads <br />79 Regrade tlrill pads and mud pits <br />80 Replace topsoil from stockpile [o drill pads <br />81 Rip drill pad for water tank boreholes <br />82 Regrade 1.2 million gallon water tank pad <br />83 Salvage topsoil from 1.2m gallon water tank pad <br />84 Replace topsoil from stockpile to 1.2m gallon water tank pad <br />85 Rip 1.2m gallon water tank pad <br />86-8 Task number not assigned <br />89 Drill seetl mix #1 <br />90 Broadcast seetl mix #1 <br />91 Hydroseed mix#1 <br />92 Broadcast seetl mix #2 <br />93 Transplant shrub mix #1 <br />94 Tansplant shrub mix rF2 <br />95-6 Task number not assigned <br />97 Replace topsoil from stockpile NSS to RPE <br />98 Replace topsoil from stockpile to RPE ponds <br />99 Replace topsoil from stockpile to RPE roatl <br />100 Replace topsoil from water tank stockpile to LRP <br />101 Replace topsoil from stockpile to atlditional disturbance at mine entance <br />102 Rip RPE road for reclamation <br />103 Rip expanded mine entrance area <br />104 Regrade RPE mad <br />105 Regrade mine entrance expansion area <br />106 Remove RPE ponds <br />107 Pull up material for RPE road reclamation <br />108 Regrade NSS area entrance roatl <br />709 Regrade RPE sediment control ditches <br />Fonn Fleet Task <br /> Direct Cost <br />Used Size Hours <br />dozer 0.03 $ 24 <br />dozer 2.24 $ 1,836 <br />dozer 8.46 $ 6,917 <br />scraperl 34.43 $ 19,955 <br />scraperl 8.79 $ 5,093 <br />scraperl 3.42 $ 1,939 <br />dozer 6.51 $ 5,330 <br />loader 227.85 $ 179,196 <br />loader 299.83 $ 258,168 <br />scraperl 187.22 $ 108,508 <br />dozer 32.83 $ 26,856 <br />tlozer 29.85 $ 24,424 <br />dozer 30.90 $ 25,278 <br />dozer 9.18 $ 7,515 <br />dozer 7.13 $ 5,633 <br />compact 16.54 $ 2,826 <br />dozer 0.14 $ 122 <br />dozer 1.21 $ 989 <br />dozer 0.04 $ 31 <br />dozer 0.22 $ 183 <br />dozer 1.95 $ 1,599 <br />tlozer 1.31 $ 1,113 <br /> $ - <br />tlozer 0.85 $ 692 <br />dozer 1.90 $ 1,555 <br /> 2.39 $ 1,952 <br /> 304.44 $ 263,818 <br />dozer 0.61 $ 522 <br />dozer 0.82 $ 672 <br />dozer 0.49 $ 374 <br />dozer 0.12 $ 104 <br />dozer 0.83 $ 676 <br />dozer 0.57 $ 467 <br />dozer 0.51 $ 420 <br />dozer 0.18 $ 153 <br /> $ - <br />revege 146.36 $ 127,600 <br />revege 30.00 $ 46,562 <br />revege 44.52 $ 105,920 <br />revege 0.80 $ 471 <br />revege 95.20 $ 241,846 <br />revege 0.90 $ 4,958 <br /> $ - <br />loader 29.41 $ 23,270 <br />loatler 7.06 $ 5,415 <br />loader 1.53 $ 1,203 <br />loader 34.65 $ 32,643 <br />loader 2.13 $ 1,360 <br />dozer 0.12 $ 98 <br />dozer 0.14 $ 122 <br />dozer 4.19 $ 3,431 <br />dozer 1.15 $ 941 <br />dozer 36.61 $ 21,219 <br />excavate 14,65 $ 2,013 <br />dozer 0.07 $ 58 <br />tlozer 0.25 $ 209 <br />SUBTOTAL 1673.53 $ 1,574,479 <br />
The URL can be used to link to this page
Your browser does not support the video tag.