Laserfiche WebLink
Page 5 of 6 <br />File name: cost summary.xls <br />TASK LIST (DIRECT COSTSI <br />Task no. Task description Form Fleet Task Direct Cost <br /> Used Size Hours <br />244 Task number not assigned $ - <br />245 Spread topsoil on parking lot expansion approvetl in MR-317 dozer 3.15 $ 644 <br />246 Regratle to AOC 1.1 acres (drill pad and light-use road MR-319) tlozer 1.32 $ 271 <br />247-8 Task number not assigned $ - <br />249 Regrade 0.45-ac. tldll pad, approved MR-320 dozer 0.52 $ 107 <br />250-1 Task number not assigned $ - <br />252 Regrade 1-ac. drill pad and 200' X 30' road, approved MR-321 dozer 2.49 $ 509 <br />253-4 Task number not assigned $ - <br />255 Regrade drill patl for thre 23HG2E welts, approved MR-322 dozer 2.32 $ 475 <br />256-7 Task number not assignetl $ - <br />258 Regrade drill patl, approvetl MR-324 tlozer 1.13 $ 230 <br />259-60 Task number not assigned $ - <br />261 Regrade drill pads for wells 24GHG2E37XC, A&B, apprtl MR-326 dozer 1.13 $ 231 <br />262-3 Task number not assigned $ - <br />264 Regrade two tlnll pads antl 600'X12' access rd., appr'tl MR-327 tlozer 2.26 $ 461 <br />265-7 Task number not assigned $ - <br />268 Regrade drill pad and rd. to boreholes approved MR-328 dozer 1.54 $ 316 <br />269-73 Task number not assigned $ - <br />274 Push fill onto cencrete caps at top of RPE vent shaft 0.43 $ 88 <br />275 Rip and remove gravel f-storage area, approved TR-106 loader 0.83 $ 500 <br />276 Rip storage area prior to seeding tlozer 0.80 $ 171 <br />277 Task number not assigned $ - <br />278 Regratle tlnll pads of 15 MDWS, apprtl MR-334 dozer 65.07 $ 13,309 <br />279 Task number not assigned $ - <br />280 Regrade light-use roads to MDWS, appr'd MR-334 dozer 6.39 $ 1,307 <br />281-0 Task number not assigned $ - <br />285 Excavate HDPE pipe extending 1500' f/heater bltlg at shaft 1 to MDW 23-08 excavate 1.31 $ 163 <br />286 Task number not assigned $ - <br />287 Rip aggregate road base on Sylvester Gulch Rd extension 8.56 $ 1,816 <br />288 Task number not assigned $ - <br />289 Load antl haul offsite aggregate roatl base f/Sylvester G. Rd extension 71.16 $ 17,200 <br />290 Exwvatelload into truck embankment bonow material f/Syl. G. Rtl ext. excavate 29.77 $ 3,714 <br />291 Haul offsite excavatetl embankment bonow material f/Syl. G. Rd ext 313.25 $ 20,190 <br />292 Task number not assigned $ - <br />293 Compact regraded Sylvester G. Rd. extension 5.26 $ 1,142 <br />294 Distribute stockpiletl topsoil on Sylvester G. Rd extension 39.58 $ 11,890 <br />295 Rill/gully maintenance antl weed control - i6 hours, 3 times in 10-yr penotl 48 $ 2,400 <br />296 Regrade Deer Creek shaft 1-acre drill pad antl 0.26-aae access roatl 7.26 $ 1,070 <br />297 Replace topsoil from Deer Creek shaft stockpile to drill patl and access road 4.38 $ 646 <br />298 Mobilize equipment three times for long-term maintenance 7.00 $ 4.363 <br />299 Mobilize equipment for final reclamation 5.50 $ 32,785 <br /> SUBTOTAL 630.41 $ 115,998 <br />GRAND TOTAL-DIRECT COSTS 22684.26 $ 10,749,483 <br />