My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE100682
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE100682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:55:17 PM
Creation date
11/24/2007 7:17:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg 816-47 to 816-129(a)
Section_Exhibit Name
PART 816
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Section 816.52 (b) Continued. <br />(i) Be adequate to measure accurately and record water quantity and <br />quality of the discharges from the permit area; <br />(ii) In all cases in which analytical results of the sample collections <br />indicate noncompliance with a permit condition, or applicable standard <br />has occurred, shall result in the person who conducts the surface <br />mining activities notifying the regulatory authority within 5 days. <br />47here a National Pollutant Discharge Elimination System (N?DES) permit <br />effluent limitation noncompliance has occurred, the person who conducts <br />surface mining act ivies shall forward the analytic results concurrently <br />with the written notice of noncompliance. <br />(iii) Result in quarterly reports to the regulatory authority, to <br />include analytical results From each sample taken during the quarter. <br />Any sample results which indicate a permit violation will be reported <br />immediately to the regulatory authority. In those cases where the <br />discharge for which water monitoring reports are required is also <br />y subject to regulation by a NFDES permit issued under the Clean Water Act <br />of 1977 (30 U.S.C. Sec. 1251-1378) and where such permit includes <br />provisions for equivalent reporting requirements and requires filing of <br />the water monitoring reports within 90 days or less of sample collection, <br />the following alternative procedure shall be used. The person who <br />conducts the surface mining activities shall submit to the regulatory <br />authority on the same time schedule as required by the NPDES permit or <br />within 90 days following sample collection., whichever is earlier, <br />either-- <br />(A) A copy of the completed reporting form filed to meet NFDES permit <br />requirements; or <br />(B) A letter identifying the State or Federal government official with <br />whom the reporting form was filed to meet NPDES permit requirements and <br />the date of filing. <br />816-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.