<br />-5- <br />15. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT A REVISION <br />REQUEST FOR THE DAYLIGHTING OF A VENTILATION PORTAL WITHIN THE 2-WEST <br />AREA OF THE EAGLE N0. 5 MINE PRIOR TO MINING APPROACHING CLOSER THAN <br />100' TO THE SURFACE. THE DIVISION CANNOT DETERMINE THE SIGNIFICANCE OF <br />SUCH AN OPERATIONAL REVISION PRIOR TO ITS SUBMITTAL, BECAUSE THE NATURE <br />OF THE ENVIRONMENTAL AND MINE PLAN IMPACTS ARE DEPENDENT UPON <br />SITE-SPECIFIC ELEMENTS OF THE SPECIFIC PROPOSED REVISION. FURTHER, THE <br />OPERATOR SHALL NOT PROCEED CLOSER THAN 100' TO THE SURFACE UNTIL A <br />REVISION APPROVAL HAS BEEN GRANTED BY THE DIVISION. <br />16. IN ORDER TO VERIFY THE ACCURACY OF THE POST-MINING TOPOGRAPHY AIVD THE <br />VOLUMETRICS PRESENTED ON TABLE IV-4b, THE DIVISION DIRECTS EMPIRE ENERGY <br />CORPORATION TO SUBMIT A DEMONSTRATION THAT THE METHODOLOGY USED TO <br />DETERMINE THE RECLAIMED CONFIGURATION IS IN COMPLIANCE WITH RULE 4.14. <br />THIS DEMONSTRATION SHALL BE SUBMITTED WITHIN 45 DAYS OF PERMIT ISSUANCE. <br />17. IN ORDER TO CONFIRM THAT THE PROPOSED POST-MINING CONFIGURATION HAS BEEN <br />ACHIEVED, THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PROVIDE AN <br />ANALYSIS OF THE POST-MINING SURFACE UTILIZING APPROPRIATE SURVEYING <br />TECHNIQUES PRIOR TO TOPSOIL REAPPLICATION AND/OR REVEGETATION. <br />18. WITHIN 120 DAYS OF PERMIT ISSUANCE, THE DIVISION DIRECTS EMPIRE ENERGY <br />CORPORATION TO IDENTIFY ALL RE-CREATED DRAINAGES ASSOCIATED WITH THE <br />PROPOSED POST-MINING TOPOGRAPHY. THE APPLICANT SHALL PROVIDE PLANS, A <br />DISCUSSION OF THE CONSTRUCTIUIV AND A DEMONSTRATION BASED ON THE <br />RE-ESTABLISHED GRADE THAT THE DRAINAGE WILL BE GEOMORPHICALLY STABLE. <br />19. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO AMEND MAP IV-2 TO <br />DEPICT THE EXISTING AND PROPOSED BOUNDARIES OF THE COAL PROCESSING WASTE <br />PILE AT THE EAGLE N0, 5 AND N0. 9 MINE COMPLEX. AMENDMENT OF MAP IV-2 <br />SHALL BE COMPLETED IN ACCEPTABLE FORM NO LATER THAN 30 DAYS FOLLOWING <br />ISSUANCE OF THE PERMIT. <br />21. GIVEN THE FACT THAT A SUFFICIENT HYDROSTATIC HEAD MAY BUILD UP WITHIN <br />THE COMPLETED EAGLE N0. 5 MINE WORKINGS TO CAUSE MINE WATER DISCHARGES, <br />THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PROJECT THE HYDRAULIC <br />HEAD WITHIN THE MINE AIJD DEVELOP A PLAN TO SEAL MINE OPENINGS TO PREVENT <br />DRAINAGE OF MINE WORKINGS TO THE SURFACE, THIS PLAN MUST SHOW THAT THE <br />WORKINGS WILL BE ABLE TO WITHSTAND THE EXPECTED HYDROSTATIC HEAD <br />DEVELOPED WITHIN THE EAGLE N0. 5 MINE WORKINGS. THIS PLAN SHALL BE <br />SUBMITTED TO THE DIVISION WITHIN ONE YEAR OF PERMIT ISSUANCE. <br />22. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO MONI7DR THE ELEVATION <br />AND ORIENTATION OF ALL RESIDENCES EXISTING WITHIN EMPIRE VILLAGE AND THE <br />PRIVATE RESIDENCE LOCATED WITHIN THE NE 1/4 of the SE 1/4 OF SECTION 30 <br />OF T6N, R41W. THIS SURVEY MONITORING SHALL BE COMPLETED QUARTERLY AND <br />THE RESULTS INCLUDED WITHIN THE SEMI-ANNUAL SUBSIDENCE P10NITORING <br />REPORT, TO BE SUBMITTED IN ACCORDANCE WITH RULE 2.05.6(6)(c)(i)(E), <br />