Laserfiche WebLink
'- - - -~ <br />-6- <br />23. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT AN AMENDED <br />SUBSIDENCE REPORT FORMAT, FOR USE IN COMPLETING THE REQUIRED SEMI-ANNUAL <br />SUBSIDENCE MONITORING REPORTS, AS REQUIRED BY RULE 2.05.6(6)(c)(i)(E). <br />IN ADDITION TO THE SURVEY DATA SHEETS AND MAPS THE AMENDED FORMAT SHALL <br />INCLUDE, AT A MINIMUM: (1) CROSS-SECTIONAL PLOTS PROJECTED ALONG THE <br />LABELED MONUMENT SERIES SECTION LINES; AND (2) NARRATIVE REPORTS <br />COMPARING THE OBSERVED SUBSIDENCE OCCURRENCE WITH THE PROJECTIONS <br />CONTAINED WITHIN THE PERMIT APPLICATION. THE CROSS-SECTIONAL PLOT SHALL <br />BE CUMULATIVE, IN ORDER TO ALLOW READY COMPARISON OF SUBSEQUENT DATA OF <br />UNDERGROUND WORKINGS RELATIVE TO THE LOCATION OF MONITORED MONUMENTS. <br />THIS REQUIRED AMENDED SUBSIDENCE MONITORING REPORT FORMAT SHALL BE <br />SUBMITTED TO THE DIVISION FOR REVIEW WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />24. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUPPLEMENT THE <br />PROPOSED SUBSIDENCE MONITORING PROGRAM FOR STATE HIGHWAY 13. EMPIRE <br />ENERGY CORPORATION IS DIRECTED TO CONDUCT DAILY VISUAL INSPECTIONS OF <br />STATE HIGHWAY 13 AND COUNTY ROAD N0. 107, FOK THE PURPOSE OF IDENTIFYIPJG <br />AND BARRICADING ANY SUBSIDENCE OCCURRENCE WHICH MIGHT ENDANGER THE <br />HEALTH AND SAFETY OF THE PUBLIC OR EMPLOYEES USING THESE PUBLIC <br />THOROUGHFARES. <br />Doc. No. 6284 <br />