Laserfiche WebLink
<br />-4- <br />8. IN ACCORDANCE WITH RULE 2.05.3(2)(0), PRIOR TO ANY ADDITIONAL PROPOSED <br />SURFACE DISTURBANCES THE APPLICANT SHALL PROVIDE APPROPRIATE MAPS <br />PREPARED IN SUFFICIENT DETAIL TO DESCRIBE ALL PROPOSED SURFACE <br />DISTURBANCES TO BE ASSOCIATED WITH THE UNDERGROUND P1INING ACTIVITIES <br />WITHIN THE PERMIT AREA. ANY ROADS PROPOSED TO BE CONSTRUCTED AFTER THE <br />APPROVAL OF THIS PERMIT WILL BE SUBJECT TO A REVISION AND THE DIVISION <br />SHALL BE NOTIFIED SO THE APPLICANT CAN BE INFORMED AS TO THE NEED FOR <br />TOPSOIL REMOVAL. <br />PRIOR TO ANY SURFACE DISTURBAIVCE BY HEAVY EQUIPMENT DURING MAINTENANCE <br />OR CONSTRUCTION ACTIVITIES, SUCH AS THOSE DISCUSSED ON PAGE IV-60 OF THE <br />APPLICATIONV, THE APPLICANT SHALL NOTIFY THE DIVISION SO THE DIVISION CAN <br />DETERMINE THE NEED FOR TOPSOIL REf40VAL. <br />9. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PROVIDE FIVE (5) YEARS <br />WORTH OF CROP PRODUCTION DATA FOR THE CROPLANDS AND HAYFIELDS TO SERVE <br />AS THE REVEGETATION SUCCESS STANDARD. THE DATA SHALL BE SUBMITTED TO <br />THE DIVISION AND INCORPORATED INTO THE PERMIT APPLICATION BY DECEMBER <br />15, OF EACH YEAR. <br />10. WITHIN 90 DAYS OF PERMIT ISSUANCE THE DIVISION DIRECTS EMPIRE ENERGY <br />CORPORATION TO SUBMIT REVEGETATION SUCCESS STANUARDS, PURSUANT TO RULE <br />4.15.10, FOR PREVIOUSLY MINED AREAS: THE NO. 5A PORTAL AREA, POIVDS <br />5A-P2 and 3, THE OLD SHOP, THE TEMPORARY OFFICE AND THE CRUSHER SITE. <br />STANDARDS SHALL NOT BE LESS THAN THE MINIMUM GROUND COVER EXISTING <br />BEFORE REDISTURBANCE, AND SHALL BE ADEQUATE TO CONTROL EROSION. <br />11. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO DEVELOP ADEQUATE <br />REVEGETATION SUCCESS STANDARDS FOR THE N0. 5 PORTAL AREA AND THE COAL <br />PROCESSING WASTE PILE PURSUANT TO RULE 4.15.7. STANDARDS FOR COVER, <br />PRODUCTION, WOODY PLANT DENSITY AND SPECIES DIVERSITY SHALL BE <br />INCORPORATED INTO THE PERMIT APPLICATION WITHIN 90 DAYS OF PERMIT <br />ISSUANCE. <br />12. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO PLACE FOUR FEET OF <br />NON-TOXIC, NON-ACIDIC AND NON-ALKALINE MATERIAL ON THE COAL PROCESSING <br />WASTE PILE UNTIL SUCH TIME AS EMPIRE ENERGY CORPORATION SATISFACTORILY <br />DEMONSTRATES TO THE DIVISION THAT THE REVEGETATION REQUIREMENTS OF RULE <br />4.15 CAN BE ACHIEVED USING LESS THAN FOUR FEET OF NON-TOXIC COVER. <br />13. THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO SUBMIT A REVEGETATION <br />MONITORING PLAN PURSUANT TO RULE 4.15.1(4) WITHIN 30 DAYS OF PERMIT <br />ISSUANCE. <br />14. TO ENSURE PROTECTION OF GOLDEN EAGLE NESTS, NO SURFACE DISTURBANCE WILL <br />OCCUR FROM JANUARY 15 TO JULY 15 IN THE FOLLOWING AREAS: <br />TSN, R91W NW 1/4 OF SECTION 8 <br />T6N, R92W SW 1/4 OF SECTION 36 WITHIN THE PERMIT <br />AREA <br />NE 1/4 OF SECTION 36 <br />S 1/2 NW 1/4 OF SECTION 36 <br />SE 1/4 OF SECTION 35 WITHIN THE PERMIT <br />AREA <br />SE 1/4 OF SECTION 25 <br />