My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56530
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:55 PM
Creation date
11/23/2007 11:32:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
General Documents
Doc Date
3/19/1999
Doc Name
CONNELL RESOURCES INC TIMNATH CONNELL PIT APPLICATION TO LARIMER CNTY FOR USE BY SPECIAL REVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rob Helmick <br />~ ~ July 20, 1999 <br />tl Page 5 <br />6 <br />The Timnath Connell site contains an estimate of 2.5 million cubic yards of sand <br />and gravel reserve. The average depth of the deposit is 11 feet below the <br />overburden depth of 5 feet. <br />Currently, Connell processes approximately 400,000 tons of aggregate per year. <br />Connell expects to keep this same rate of production at the Timnath Connell Pit. <br />They will mine between 10 to 20 acres per year. At this rate of mining Connell <br />expects to mine and reclaim the site in eight to ten years. Reclamation will be <br />concurrent with mining. <br />The final reclamation plan for the site is a lined water storage reservoir. The <br />DMG Reclamation Plan Exhibit F illustrates the approximate dimensions of the <br />lake. <br />Connell proposes to use the Timnath Connell Pit as an extension of the existing <br />Wellington Downs Pit. Connell will excavate, crush, wash, size, sort and sell <br />aggregate at the Timnath Connell Pit. They will transport aggregate to the <br />Wellington Downs site for use in the asphalt batch plant. <br />2. Expected ra~mber of clients/patrons per day. Comtell serves approximately 50 to <br />100 clients a year. Due to the nature of their business, supplier of asphalt and <br />sand and gravel base materials, they generally get hired for larger contract projects <br />that require a lazge quantity of material. As mentioned above they serve local and <br />state governments and private industry. <br />3. Number of employees. Connell will employ approximately 15 people at the <br />Timnath Connell Pit operation. A good portion of these employees currently <br />work at the Wellington Downs Pit. <br />4. Days and hours of operation. Monday through Saturday, 7:00 a.m. - 6:00 p.m. <br />This is the hours allowed for the extraction, processing and hauling of the <br />resource. Equipment maintenance occurs from 6:00 p.m. to 9:00 p.m., Monday <br />through Saturday. The hours listed above are the hours currently allowed for the <br />Wellington Downs Pit. We are not requesting a change with this application. <br />5. Projected daily traffic to and from the site. Through the sale of their products, <br />Connell will generate truck traffic on the 1-25 Frontage Road, Harmony Road and <br />State Hwy 392. Connell expects to mine approximately 400,000 tons of aggregate <br />annually. They expect an average carrying weight of 25 tons/truck. For the <br />purpose of this daily truck traffic prediction, a [ruck load is defined as a loaded <br />truck leaving the site. A truck trip is any truck entering or leaving the site. <br />Therefore, one loaded truck actually generates two truck trips. <br />
The URL can be used to link to this page
Your browser does not support the video tag.