Laserfiche WebLink
John C. Weinman <br />Hayden Gulch Loadout <br />Page 2 <br />August 17, 2007 <br />Appendix 3-4, PAP). The PAP reads as though the lines were dedicated to site <br />operations. Please acquire from YVEA, and insert into the reclamation plan, a letter of <br />anticipated course of action (removal, or retention in support of current other or future <br />uses) in the event that the site is abandoned and the permit terminated. <br />Please call me if you have any questions. <br />Yours truly, <br />ByronTi. Walker <br />Environmental Protection Specialist <br />1 Enclosure, as stated <br />Files: electronic: general correspondence, C-1992-081 <br />C:\bgw\My Documents\Hayden Gulch Loadout\MR\pending\cbci response.doc <br />