My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56130
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:03 PM
Creation date
11/23/2007 11:09:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/26/1991
Doc Name
INVITATION AND BID-East Mine reveg project
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment must be in good operating condition and must be maintained in <br />good operating condition by the CONTRACTOR throughout the life of the <br />contract. The PROJECT MANAGER shall be the sole judge of whether <br />equipment is or is not in "good operating condition". <br />Equipment of any size above the minimum flywheel horsepower may be <br />furnished subject to the approval of the PROJECT MANAGER. In order to <br />evaluate the bids for various sizes of equipment proposed to be furnished <br />by the bidders, the unit price inserted in the bid must be adjusted. The <br />bidder may figure the unit price to insert in the Invitation and Bid by <br />doing the following computation for the applicable bid item: If the <br />desired unit rate to be received is $70.00 per hour for a 215 FHP <br />bulldozer and the minimum FHP requested is 140, then multiply $70.00 X <br />140/215 = $45.50 per hour. Use that calculated amount ($45.50 in the <br />example) as the unit price on the Invitation and Bid. If the CONTRACTOR <br />plans to furnish a machine other than the minimum FHP listed on the <br />Invitation and Bid, he must write the FHP of the machine, in ink, under <br />the bid item in the Invitation and Bid. <br />After the successful bidder has furnished evidence of the FHP capacity of <br />the equipment to be used, the amount bid for Equipment Rental will be <br />modified by reversing the above procedure to reflect the unit price <br />desired by the CONTRACTOR with a corresponding reduction in the quantity <br />of hours required. This modified hourly rate and number of hours will <br />appear on the Purchase Order. <br />The number of hours indicated in the Special Conditions and on the <br />Invitation and Bid Sheet are estimated. It is impossible to determine in <br />advance the actual number of hours that the equipment rental will be <br />necessary. <br />4.3 Execution <br />A. Operators <br />The equipment shall be furnished complete with competent operating <br />personnel. Operators shall be qualified to perform all work under this <br />specification in a skillful and workman like manner. The OWNER may, in <br />writing, require the CONTRACTOR to remove from the work any employee the <br />OWNER deems incompetent or careless. <br />B. Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical <br />operations of the equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done so spillage of <br />lubricants and fuel is minimized. <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.