My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL56122
DRMS
>
Back File Migration
>
General Documents
>
GENERAL56122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:02 PM
Creation date
11/23/2007 11:09:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
8/18/1993
Doc Name
EMISSION PERMIT
Permit Index Doc Type
PUBLIC CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ STATE OF COLORADO <br />' C <br />COLORADO DEPARTMENT OF HEALTH ~ '- ~~:°` `-°~, <br />AIR.POLLUTION CONTROL DIVISION ~ .;:: ,- :_- -:: ._ ~' ~~~ <br />TELEPHONE:..(303) 692-3150 `:.~;_._ ....:...:.......::'~_~.:.~_~ '.:...~ <br />_ - .. <br />EMISSION PERMIT <br />PERMIT NO: 92GA1494 <br />n~gusr ls, 1993 INITIAL APPROVAL <br />DATE ISSUED: <br />ISSUED TO: GRAND VALLEY COAL CO. <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Underground coal mine; known as The McClave Canyon Mine; located on State <br />Highway 139, Garfield County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Underground coal mine vent fan system. <br />• THIS PERMIT fS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY CONTROL ACT C.R.S. (25-7- <br />1011 et sea), TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE REVERSE_SIDE OF <br />THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. Visible emissions shall not exceed twenty percent (20%) opacity. <br />2. The permit number shall be marked on the subject equipment for ease of identification. <br />3. The manufacturer, model number and serial number of the subject equipment shall be provided <br />to the Division prior to Final Approval. <br />4. Construction of this source must commence within 18 months of initial approval permit <br />issuance or within 18 months of the start-up date stated in the application. If commencement <br />does not occur within the stated time the permit will expire on February 18, 1995 <br />(See General Condition No. 6., Item 1 on the reverse side of the first page of this permit.) <br />5. Emissions of air pollutants shall not exceed the following limitations las calculated in the <br />Division's preliminary analysis): <br />Particulate Matter: 2.65 tons/year <br />PM,o: 1.3 tons/year <br />Non Reactive Volatile Organic Compounds: 925 tons/year <br />las Methane) <br />• 045/17/2 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.