<br /> GRAND VALLEY COAL CO. - - -- - - - - ~ . "
<br /> Permit No.
<br />92GA1494 : -
<br />
<br />.: .
<br />..
<br />._ , ;-:.... - .~: .,-:.,.: _., --...
<br />::,, ; ., :. ., •:= .- •-
<br />•.:..._... ~ ;:.,. Inival Approval,:: -,. +::., .. _ . _. - ..._. ...- __.,- , .... ..._.- ,,, . .._.,:.,... . ...:;,; :~_::
<br />- -Page 2 ~,±
<br />- ~ e.: ,~ _..
<br />e
<br />-~
<br />~
<br />:
<br />-
<br />-
<br />- ~,:,~-;•-::
<br /> ... ... , ,...
<br />. ..,
<br />.
<br />.
<br />.
<br />.
<br />-
<br />_.
<br />- ..
<br />.
<br /> ... , ,r-. ,~:..,~.
<br />6. This source shall be limited to a maximum production rate as listed below and all other
<br />activities, operational rates and numbers of equipment as stated in the applicatiori. Annual
<br />records of the actual production rate shall be maintained by the applicant and made available
<br />to the Division for inspection upon request.
<br />Production of coal shall not exceed 250. tons/hour or 246,000 ton/year.
<br />•
<br />•
<br />7. At all times, including periods of start-up, shutdown, and malfunction, the facility and control
<br />equipment shall, to the extent practicable, be maintained and operated in a manner consistent
<br />with good air pollution control practices for minimizing emissions. Determination of whether
<br />or not acceptable operating and maintenance procedures are being used will be based on
<br />information available to the Division, which may include, but is not limited to, monitoring
<br />results, opacity observations, review of operating and maintenance procedures, and inspection
<br />of the source.
<br />sy: ~~1~
<br />Jo Plog. P.E.,
<br />P,e mit Engineer/Re/~er
<br />Br / ~ ~lit+r
<br />James S. Geier, P.E., Chief
<br />New Source Review Section
<br />Stationary Sources Program
<br />Air Pollution Control Division
<br />-;:
<br />045/17/2
<br />~ ~~'
<br />
|