Laserfiche WebLink
,, <br />;, <br />LJ <br /> <br />PART I <br />Page 4 <br />Permit No. COR-OA0000 <br />A. COVERAGE UNDER THIS PERMIT (wntJ <br />As of October 1, 1992, this address will change to: <br />Colorado Department of Health <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creep Drive Soath <br />Denvtt, Colorado 80222-1530 <br />Attmtien: Permits and Enforcement Sxtion <br />b. Smmnary of AppBca6oo: The appliatioa requires, at ^ T;~;+~,=, the foBowmg: <br />1) Name, and address of the appliant; <br />2) Site addrwe and location; <br />3) Facility contact person sad telephone numbs; <br />4) Standud Jadustrial CLiseificatioa (SIC) code(s); <br />5) The aim of the mining operation in saw; <br />6) Status as active or inactive; <br />7) Lint of any other enviromaeatal permits eartmtly hdd by the facility; <br />8) AGivitiw which take place et the site; <br />9) Receiving waters; and <br />10) For new adire mining operations (beginaiag operations afttt 10/1/92) or ezistirtg ficr7rtiw applying agar <br />7/1/93, certification m to Ore preparation of a SWMP. For 1rra~IR tmaiag operations applying afer Jaly <br />1, 1994, certification ss to the preparation and implementation of a SWMP. <br />c. Certif'i®tion of SWMP Completion and Implaneahtion <br />For active mining operations, t~dcting on October 1, 1992, the pecmittee ahaB have implemented and be in <br />compliance with their SWMP, as soon as possible but no later than the aaniverary date of their Mined Lend <br />Reclamation permit that fills between July 1, 1993 and June 30, 1994. Certifiatioa to this effau mrst be <br />received by the Division on or beforo that date. <br />For new attire facilities (beginning operation after October 1, 1992), sad for all other active facilites applying <br />after July 1, 1993, the SWMP shall be prepared prior to applying for coverage uadtt the general permit. <br />For iaat:tire mixing operations, applying beforo Jaly 1, 1994, as aocn as poanble but tro Lter than July 1, 1994, <br />the permittee shall have implemented sad be in cor~tliaace with their SWMP. Certification to this effect tenor <br />be roceived by the Division o0 or before that date. For those applying afro 7uly 1, 1994, the SWMP shall be <br />prepared prior to applying for coverage under the general permit. <br />4. Permit Certifiption Prvicedutet <br />If this general permit is appropriate for the eppliaaat's operation, then a ctttificatioa will be developed and the appGuat <br />will be authorised to discharge stormwater under this general permit. <br />a. Request for Additions! Giformation: The Division shall have up W fttirty days after receipt of the above <br />information to request additional data sad/or deny the wthoriutian for any particular discharge. Upon roceipt <br />of additional information, the Dtviuoa shall have oo additiood fiflrea days to taros or dewy authorinnm far the <br />particular discharge. Temporary coverage under this general permit will be allowed until the individual permit <br />gow into effect. <br />b. Automatic Coverage: If the applicant dos not receive a request for additional information or a naificatien of <br />deaid from the Division dated within thirty days of receipt of the application by the Division, wthoriation b <br />discharge ;a accordance with We wnditions of this permit dull be deemed granted. <br />