Laserfiche WebLink
<br />• ~ PARrI <br />Page S <br />Permit No. COR-040000 <br />A. COVERAGE UNDER THiS PERMIT (cont.) <br />c. Individual Permit Required: If, after eviluatioo of the application (or additional information, such as the <br />SWMP), it is found that this general permit is not applicable m the operation, then the application will be <br />processed u one for an individual permit or a moro appropriate general permit The applicant will be notified <br />of the Division's decision to deny certification under this general permit. For m individual permit, additional <br />information may be requested, and 1g0 days will be required [o process the applintioa and isave the permmt <br />Temporary covrnge under thin general permit will be illowed until the individual permit gets mto effect. <br />d. Temporary Coverage: Notwitlrstaading Parts I.A.4.aC, above, the Division reserves the right t0 tempotartl7 <br />authorve stormwater discharge fmm mining activity under general permits, even though individual permit <br />coverage may be'moro appropriate. <br />Certification of these activities under a general permit does not in any way infringe on the Division's tight to <br />rovoke that authorization and issue as individual permit or amend m existing individual permit. <br />e. General vs. Individual Permit Coverage: Aay owner or operator authorized by this permit may tcgoestu to 6e <br />excluded from the coverage of this permit by applying for an individual CDPS permit The rrwaer or operator <br />shalt submit as individual application, with raaoas supporting the request. to the Divieiaa at least 1t10 days Prior <br />to any discharge. <br />I,o®1 Agency Attthority: 'Ibis permit does not pre-etnpt or supersede the authority of Ixel agencies m prohibit, <br />restrict, or control discharges of smrmwater to storm drain systems or other water courses within their jutiadictiaa <br />S. Individual Permit Criteria <br />Aside from the operation type, the Division may use other criteria in evaluotiag whether an individual permit is required <br />instead of this general permit. This information may coma from the application, SWMP, or additional information as <br />coquetted by the Division, sad includes, but is not limited ter, the following: <br />a. the quality of the receiving warm (i.e., the presence of dowaatream drinlong water intake or a high quality <br />fishery, or for preservation of high quality water); <br />b. the type of mining operation, including pollution potential; <br />c. the volume end type of materials handled; <br />d. the size of the faciliry; <br />e. evidence of noncompliance under a previous permit for the operation; <br />f. the use of cbemicaLs within the stormwater system. <br />In addition, as individual permit may be required when the Division has shown or has reason to suspect that the <br />etormwater discharge is a significant contributor of pollutants to warm of the State. <br />6. &nnit Expiration Date <br />Authorization b discharge under this general permit stall ezpite on September 30, 1996. The Division must evaluate <br />sad reissue this general permit once every five years and must recertify the applicant's authority to discharge under the <br />general permit at such time. Any pecmittee desiring continued authoriution under the general permit must reapply b} <br />March 31, 1996. The Division will determine if the applicant may continue b operate under the terms of the gcaera! <br />permit. An individual permit will be required for any facility not reauthorved to discharge under the reissued gmeri <br />permit. <br />B. STORMWATER MANAGEMENT PLAN -ACTIVE MIIVES <br />A Stormwater Management Plaa (SWMP) shall be developed for the portion of each facility covered by this permit. Tbr <br />SWMP shall be prepared in accordance with good engineering practices. (Ibe plea need not be completed by a rogiatera <br />engineer. ) <br />