Laserfiche WebLink
Hours to Complete Job = 90 days or 720 hours. <br />Hourly EauiomenULabor Costs <br /> Labor Equipment <br />TYpe (k) waee r n 1 operational Total <br />Torches (4) n/a $12.00 n/a $12.00 <br />Pick-up (1) n/a $9.34 $14.39 $23.73 <br />100 ton crane (1) $18.25 $139.25 $52.63 $210.13 <br />15 ton crane (1) $18.25 $30.88 $17.17 $66.30 <br />Work Crew, tear down (4) $59.16 n/a n/a $59.16 <br />Work Crew, clean up (4) $57.16 n/a n/a $57.16 <br />= Hourly EquipmenU Labor Costs x Hours to Complete Job <br />_ ($210.13/hr x 240 hours) + $218.35/hr x 720 hrs <br />_ $207,643 <br />d. Loadout and Tipple Removal <br />Site Specific Details <br />• Removal and Clean Up will be accomplished by two-4 man crews. <br />The tear down crew wilt use a 100 ton crane and 4 cutting torch setups; the 100 ton <br />crane will be required for 720 hours. The clean up crew will use a flatbed pick- <br />up and a 15 ton crane. <br />Production <br />It is estimated that removal and clean up will take 100 days. <br />Hours to Complete Job =100 days or 800 hours. <br />Ho ~rlv .a ~iom n /Tabor .oc .c <br /> Labor Equipment <br />Tvoe l#) waee rental gperational Total <br />Torches (4) n/a $12.00 n/a $12.00 <br />Pick-up (1) n/a $9.34 $14.39 $23.73 <br />100 ton crane (1) $18.25 $139.25 $52.63 $210.13 <br />15 ton crane (1) $18.25 $30.88 $17.17 $66.30 <br />Work Crew, tear down (4) $59.16 n/a n/a $59.16 <br />Work Crew, clean up (4) $57.16 n/a n/a $57.16 <br />14 <br />December 12, 1991 <br />