Laserfiche WebLink
<br />= Hourly Equipment/Labor Costs x Hours to Complete Job <br />_ ($210.13/hr x 270 hours) + $218.35/hr x S00 hrs <br />_ $325,974 <br />e. Power line Removal <br />Sit pecific Details <br />Removal will be done by a 2-man crew using a boom truck at a rate of 500 <br />feetlday. <br />The length of the powerline is 15,850 feet (Nest Ridge = 12,300 ft; Dloffat = 3,550 <br />ft. ). <br />Hours to Complete Job = 15,850 feet+500 feet/day <br />= 31.7 days or 254 hours. <br />Hourly Eauioment/Labor Costs <br />dyne (#) <br />Pick-up Truck (1) <br />Work Crew, tear down (2) <br />Total Cost to Remove Powerlines <br />Labor Equipment <br />waee rental ooerational <br />n/a $9.34 $14.39 <br />$29.58 n/a n/a <br />Total <br />$23.73 <br />$29.58 <br />= Hourly Equipment/ Labor Costs x Hours to Complete Job <br />_ ($23.73lhr + $29.58/hr) x 254 hrs <br />$14,856. <br />f. Entrance Road Culvert Removal <br />The culvert was replaced in 1979. The cost to remove the new culvert will be the <br />same as the removal of the o]d culvert. <br />To al nc amov .n ncv~ Rnad C3~ly . _ $2,000.00 <br />December 12, 1991 <br />15 <br />