My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55803
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:46 PM
Creation date
11/23/2007 10:49:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
12/26/1991
Doc Name
EDNA MINE PN C-80-001 REQUEST FOR APPROVAL OF 1992 1996 PERMIT TERM LIABILITY AMOUNT & ITS PROPOSED
From
PITTSBURG & MIDWAY COAL MINING CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ $151,402 <br />b. Beltline Removal <br />Site Specific Details <br />• Removal and Clean Up will be accomplished by two-3 men crews. <br />The tear down crew will use a 100 ton crane and 3 cutting torch setups; the 100 ton <br />crane will be required for 65 hours.The clean up crew will use a flatbed pick-up <br />and a 15 ton crane. <br />Pro luction <br />It is estimated that each crew will work at the rate of 30 fVday. <br />Hours to Complete Job =Beltline Length + Production Rate <br />= 3,300 feet + 30 fVday <br />= 110 days or 880 hours. <br />Hourly E~y}ipmenULabor Costs <br /> Labor Equipment <br />~voe (#) wee rental operational Total <br />Torches (3) n/a $9.00 n/a $9.00 <br />Pick-up (1) n/a $9.34 $14.39 $23.73 <br />100 ton crane (1) $18.25 $139.25 $52.63 $210.13 <br />15 ton crane (1) $18.25 $30.88 $17.17 $66.30 <br />Work Crew, tear down (3) $44.37 n/a n/a $44.37 <br />Work Crew, clean up (3) $42.87 n/a n/a $43.87 <br />Total Cost to Remove Beltline <br />= Hourly Equipment/ Labor Costs x Hours to Complete Job <br />_ ($210.13/hr x 65 hours) + $154.54/hr x 880 hrs <br />_ $177,576 <br />c. Shop/Office/Misc. <br />Removal and Clean Up will be accomplished by two-4 man crews. <br />The tear down crew will use a 100 ton crane and 4 cutting torch setups; the 100 ton <br />crane will be required far 240 hours. The clean up crew will use a flatbed pick- <br />up and a 15 ton crane. <br />It is estimated that removal and clean up will take 90 days. <br />13 <br />December 12, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.