Laserfiche WebLink
STIPULATION NO. 25 <br />A NARRATIVE DESCRIPTION, LONGITUDINAL PROFILE, AND APPROPRIATE CROSS <br />SECTIONS OF THE TEMPORARY DIVERSION CHANNEL CREATED BY THE ROAD <br />CROSSING OF THE MCCLANE DRAINAGE CHANNEL WILL BE SUBMITTED FOR <br />INCLUSION IN THE APPLICATION, ALONG WITH APPLICABLE FLOW PARAMETERS. <br />SUFFICIENT INFORMATION WILL BE SUBMITTED TO DEMONSTRATE COMPLIANCE <br />WITH THE REQUIREMENTS OF 4.05.3(1), (2), (4), (5), (6), AND (7), AND / , <br />4.03.1(4)(a)(i). THESE AMENDMENTS WILL BE SUBMITTED WITHIN A COMPLETE ~ ~-• ~ ~ <br />TECHNICAL REVISION APPLICATION WITHIN 60 DAYS OF PERMIT ISSUANCE. IF <br />COMPLIANCE WITH THE CITED REQUIREMENTS CANNOT BE DEMONSTRATED, <br />THE REVISION APPLICATION WILL ADDRESS NECESSARY MODIFICATIONS TO THE <br />DIVERSION CHANNEL. <br />STIPULATION NO. 26 <br />THE ANNUAL HYDROLOGIC REPORT (AHR) COVERING THE PREVIOUS WATER ~ .- <br />YEAR FOR THE MCCLANE CANYON MINE WILL BE SUBMITTED NO LATER THAN "L <br />FEBRUARY 1 EACH YEAR. <br />STIPULATION NO. 27 <br />SEDIMENT REMOVED FROM THE SEDIMENT POND MAY BE USED AS A i/L <br />TOPDRESSING OR TOPSOIL SUPPLEMENT PURSUANT TO RULE 4.06.2(4)(a), UPON <br />SUBMITTAL OF CHEMICAL AND PHYSICAL ANALYSES DEMONSTRATING THAT <br />THE MATERIAL IS EQUAL TO OR MORE SUITABLE FOR SUSTAINING VEGETATION <br />THAN AVAILABLE TOPSOIL OR OTHER PLANT GROWTH MEDIA. SUCH <br />DEMONSTRATION SHALL BE BASED ON A REPRESENTATIVE COMPOSITE SAMPLE <br />OF THE MATERIAL OBTAINED FROM EACH POND CLEANOUT EPISODE. REQUIRED <br />PARAMETERS WILL INCLUDE THOSE LISTED IN 4.06.2(4)(a), WITH THE EXCEPTION <br />OF THICKNESS, DEPTH, COARSE FRAGMENTS, AND AREAL EXTENT. ANALYSES <br />FOR SELENIUM, BORON, NITROGEN, AND ORGANIC MATTER WILL BE INCLUDED <br />IN ADDITION TO THOSE LISTED. POND CLEANOUT MATERIAL WILL NOT BE <br />PLACED IN THE TOPSOIL STOCKPILE OR USED AS FINAL RECLAMATION <br />TOPDRESSING PRIOR TO OBTAINING WRITTEN APPROVAL FROM THE DIVISION. <br />STIPULATION NO. 28 <br />WITHIN SIX MONTHS OF PERMIT ISSUANCE AND PRIOR TO ANY SURFACE <br />DISPOSAL OF COAL MINE WASTE, THE PERMITTEE WILL IDENTIFY THE SOURCE <br />OF AN APPROPRIATE VOLUME OF SUITABLE NON-TOXIC, NON-COMBUSTIBLE <br />COVER MATERIAL TO BE PLACED OVER THE GRADED REFUSE PRIOR TO <br />TOPSOILING, PURSUANT TO RULE 4.10.4(5). UNLESS ANALYSES ARE PROVIDED <br />WHICH DEMONSTRATE A LESSER COVER THICKNESS WILL ALLOW FOR <br /> <br />3 <br />