Laserfiche WebLink
Ci <br />PCPC <br />Re: SUP No. 596 <br />June 16, 1997 <br />Page 2 <br /> <br />Special Use Permit No. 97-13 is in association with the existing mineral extraction and <br />processing activities authorized within Special Use Permit No. 596. <br />Special Use Permit No. 596 incorporates SUP Nos. 37, 46, 230, and 281, and allows <br />for mineral extraction and processing and a concrete batch plant (See Site Location <br />Map Exhibit 3 for location of each SUP). SUP No. 37 was approved March 24, 1966, <br />with two conditions: <br />1. That the Lakeshore resulting from excavation be progressively brought to a <br />safe and natural slope as the work progresses. <br />2. That the excavation process be limited to the area South of Booth Orchard <br />Ditch but the hatching plant process may be installed and maintained North of <br />the ditch. <br />Special Use Permit No. 46 was approved October 27, 1966, to allow extracting and <br />processing of rock, sand, and gravel without additional conditions. <br />Special Use Permit No. 230 was approved June 26, 1973, with four conditions: <br />1. Egress and ingress to site from Baxter Road must be approved by County <br />Road Commissioner. <br />2. Load limits to be determined by County Road Commissioner. <br />3. Completed excavations will leave banks sloped in a reasonable and safe <br />condition. <br />4. Operation hours are from dawn to dusk or in accordance with times of day <br />light hours as fixed by the U.S. Weather Bureau which ever affords greater <br />time. <br />Special Use Permit No. 281 was approved January 24, 1984, with four conditions: <br />1. Fountain Sand and Gravel Company be responsible for fugitive dust <br />emissions control on unpaved haul road and the unpaved portion of <br />Stockyard's Road. <br />