Laserfiche WebLink
• <br />PCPC <br />Re: SUP No. 596 <br />June 17, 1997 <br />Page 8 <br />The batch plant exists and the property is fenced and gated, but no <br />commercial activity was observed. <br />the current frontage road and Hwy. 96/50 access point serves the batch plant <br />and two residences, one of which is vacant, and will become a portion of <br />Parcel A of Lot Line Rearrangement No. 97-02. The more westerly residence <br />is occupied. <br />2. The applicant is proposing to open the existing batch plant and establish <br />ancillary concrete and aggregate product sales to be located exclusively within <br />newly created Parcel A of Lot Line Rearrangement No. 97-02. The boundaries <br />of the approximately 1000-plus acres of property utilized for mineral extraction <br />activities are not affected by this new special use permit. <br />3. Section 36(f) of the Pueblo County Zoning Resolution establishes the findings <br />the Planning Commission must make in its approval of a special use permit. <br />Following is a list of those findings in bold face print, with staff comments <br />indented thereafter. <br />(a) The requested use is a use listed as a special permitted use in the <br />district in which the parcel is located. <br />Staff: The requested batch plant is listed as ause-by-review in the A-2 <br />Zone District. Ancillary sales of concrete and aggregate products would <br />be considered accessory to the concrete manufacturing activity. <br />(b) The granting of the special use appeal will not substantially modify <br />the land use plan or the intent, purpose and spirit of this resolution. <br />Staff: This special use permit does not significantly modify the land use <br />plan. According to the Zoning Resolution, the spirit and purpose of the A- <br />2, Agricultural (minimum 5 acres) Zone District is "designed to retain and <br />promote the appropriate use of dry range and irrigated lands and <br />encourage open use of the land in keeping with its natural characteristics <br />and agricultural functions." <br />This special use permit is generally consistent with that intent. The <br />concept of zoning underlying "special Use' or "uses-by-review" is that <br />such uses are not inherently inconsistent with the "principal uses" or <br />"uses-by-review" of the zone district. However, a specific use-by-review <br />may not be appropriate at all locations throughout the zone district. <br />