Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br />~~ <br />~L <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />LI <br /> <br /> <br />• Field Inspection <br />- Mapping <br />- Determination of slope failure types <br />- Preliminary determination of remedial measures <br />• Design Engineering <br />- Estimate forces on slide <br />- Determine appropriate factor of safety <br />- Design remedial measures <br />From this work, a response has been prepared for submittal to the <br />Division to answer all requirements of Stipulation No. 2. The following <br />report outlines methods, calculations, and proposed designs for <br />mitigating unstable slope conditions along access and haul roads at the <br />Grassy Gap Mine after mining has been completed and for use in <br />reclamation activities. It has been assumed that all haulage and access <br />roads with or associated with the unstable slope segments will be left <br />as part of the post mining land use. <br />-2- <br />