Task 13- Rill and Gully Revegetation -Section 22 <br />The steep, north-facing reclaimed slope at the west end of the mine, immediately south of the <br />Canyon Del Agua and located in the NW/4 of the NW/4 of Section 22 (see map), shall be <br />reseeded according to specifications in 20.0 Revegetation. <br />Measurement and Pavment <br />There will be no measurement for payment for Task #13. Payment for Task #13 will be <br />reflected in a lump sum bid under Item 13 on the Bid Schedule. <br />~ Task 14- Revegetation and Weed Control, Section 15 <br />Approximately 6 acres of steep slope north of the County Road at the west end of the mine <br />shall be seeded, mulched and fertilized according to specifications in 20.0 Revegetation. <br />~ ~' ~ Several thistle patches north of the County Road shall be sprayed by a certified pesticide <br />~5 ~ applicator as directed by the Project Manager. <br />~ Measurement and Pavment <br />There will be no measurement for payment for Task #14. Payment for Task #14 will be <br />reflected in a lump sum bid under Item 14 on the Bid Schedule. <br />Task 15 Revegetation <br />All areas in Sections 15 and 22 disturbed during reclamation work and any other areas <br />specified in these Special Conditions will be revegetated according to Revegetation <br />Specifications, Section 20.0, in the General Bid Specifications. Commercial fertilizer is <br />required for this project. Seed will be supplied by the OWNER. The Pinion-Juniper seed mix <br />will be drilled on all areas. If directed by the Project Manager, steep sloped areas will be <br />broadcast. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction <br />activities and ensure that each work item is completed and constructed to design specifications. <br />The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5;00 <br />P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without <br />prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br />inspections with the Project Manager so as not to delay the work. The following items must be <br />observed and approved by the PROJECT MANAGER before proceeding with additional work: <br />1. Checkdam keys <br />2. Seeding <br />3. Placement of Geotextile <br />12 <br />