My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55093
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:10 PM
Creation date
11/23/2007 10:03:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
6/3/1999
Doc Name
PROJECT NAME TRINIDAD BASIN MINE PROJECT
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 10 feet wide and will extend deep enough vertically so that runoff will exit the <br />ditch at that point. <br />Measurement and Pavment <br />There will be no measurement for payment for Task # 9. Payment for Task #9 will be reflected <br />in a lump sum bid under Item 9 on the Bid Schedule. <br />Task 10-Access Road Repair Work (NorthSouth Section) <br />There are four erosion gullies on the outslope of the north-south section of the Section 22 <br />access road (See Map 6). The gullies will be repaired as follows: <br />Gullv No. 1 exists along the outside edge of the access road across from Pond 22-P5. The <br />berm and gully will be backfilled and repaired. Gullv No. 2 is across from Pond 22-P6. At this <br />point, a 7 foot long section of the road needs to be filled in and leveled and the berm will be <br />repaired. Gullv No. 3 is located two hundred feet south of Pond 22-P6. Runoff has cut a 5 foot <br />wide gully in the road berm. The gully will be filled in and the berm repaired. Gullv No. 4 is <br />located about 200 feet northeast of Pond 22-P7. The gully will be filled and the berm repaired. <br />Measurement and Pavment <br />There will be no measurement for payment for Task #10. Payment for Task #10 will be <br />reflected in a lump sum bid under Item 10 on the Bid Schedule. <br />Task 11-Installation of Road Dips in the NorthSouth Access Road <br />C ~., E~ road dips will be installed in the north-south access road at locations marked by the <br />~5 q Project Manager (See Map 6). The road dips will be constructed pursuant to Figure 1. <br />.~ I~ 1 Measurement and Pavment <br />~1 <br />There will be no measurement for payment for Task # 11. Payment for Task #11 will be <br />reflected in a lump sum bid under Item 11 on the Bid Schedule. <br />Task 12- Remove Old Culvert <br />Two steel culverts are partially buried in a bank near the end of the north south access road. <br />These culverts will be removed for use elsewhere as directed by the Project Manager. <br />Measurement and Pavment <br />There will be no measurement for payment for Task # 12. Payment for Task #12 will be <br />reflected in a lump sum bid under Item 12 on the Bid Schedule. <br />1t <br />
The URL can be used to link to this page
Your browser does not support the video tag.