My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL55075
DRMS
>
Back File Migration
>
General Documents
>
GENERAL55075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:10 PM
Creation date
11/23/2007 10:02:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
8/1/1992
Doc Name
STATUS OF STIPULATIONS DETERMINED DURING THE 1992 RENEWAL REVIEW
From
MLRD
To
C-81-047 BLUE RIBBON STIPULATION TRACKING FILE
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />commitment of the re-installation of the survey monuments which had been <br />destroyed by previous slope movement, bench regrading and equipment <br />operations. The stipulation was considered complied with once the piezometers <br />and monuments had been installed. More detailed information can be found in the <br />Stipulation Resolution File and inspection reports dated November 8, 1983 and <br />November 29, 1983. <br />Stipulation 4 <br />NO CONSTRUCTION SHALL COMMENCE UNTIL FINAL CONSTRUCTION <br />DRAWINGS HAVE BEEN REVIEWED AND APPROVED BY THE DIVISION. <br />Status: Complied with September 21, 1984. This stipulation was added to the <br />permit document upon approval of a technical revision to reconstruct the mine <br />bench. The stipulation was considered complied with upon receipt of the final <br />construction drawings and specifications for the reconstruction of the portal bench. <br />For more information see the Permit Revisions file. <br />Stipulation 5 <br />THE APPLICANT SHALL SUBMIT AN ACCEPTABLE MONITORING PROGRAM TO <br />THE DIVISION WITHIN 30 DAYS FOLLOWING APPROVAL OF THE REVISION. <br />THIS MONITORING PROGRAM SHALL INCLUDE BOTH SLOPE STABILITY <br />MONUMENTATION AND THE INSTALLATION AND MONITORING OF WATER <br />LEVEL PIEZOMETERS, IN ORDER TO VERIFY THE PORTAL BENCH'S STABILITY. <br />TWO PIEZOMETERS SHALL BE INSTALLED IN THE BENCH SUBDRAIN TO ENABLE <br />COLLECTION AND FULLY ANALYSIS OF LEACHATE QUALITY TWO TIMES PER <br />YEAR. <br />Status: Complied with April 30, 1985. This stipulation was added to the permit <br />document upon approval of a technical revision to reconstruct the mine bench. <br />The stipulation was satisfied upon receipt of a monitoring program to monitor slope <br />stability and leachate quality of the mine bench. More information can be found in <br />the Stipulation Resolution file. <br />Stioulation 6 <br />MINREC SHALL SUBMIT REWORKED POND SIZING CALCULATIONS FOR POND <br />005 WHICH REFLECT THE INCREASED DRAINAGE AREA SHOWN BY EXHIBIT H-1 <br />BY MARCH 29, 1991. <br />Status: Complied with April 4, 1991. This stipulation was added to the permit <br />upon approval of Technical Revision 7, which addressed various issues as a result <br />of the Mid-Term review. The capacity of the pond was questioned because the <br />lower collection ditch, Ditch D, was regraded in 1988. The regraded ditch directs <br />
The URL can be used to link to this page
Your browser does not support the video tag.