Laserfiche WebLink
Stipulation No. 69 <br />Within fifreen days of consummation of the transfer of the West Elk Mine permit from Mountain <br />Coal Company to Mountain Coal Company, LLC, the Division shall be provided with <br />documentation that all necessary rights of entry, as required by section 2.03.6, have been <br />transferred to Mountain Coal Company, LLC. <br />STATUS: Complied with 07/02/98. <br />SECTION IV -PERMIT VARIANCES <br />The West Elk Mine pem~it does not involve any variances regarding mountaintop removal, or the <br />achievement of approximate original contour, or steep slope mining .There were no <br />experimental practices allowed at this site. There is also no combined surface and underground <br />mining operations at the West Elk Mine. <br />SECTION V -DECISION TO REQUIRE REVISIONS OR ADDITIONAL INFORMATION <br />Please respond to the following questions and requests on or before April I5, 1999: <br />RULE 2.03.4 Identification of Interests <br />In accordance with Rule 2.03.4(3), within the AVS system, Mountain Coal Company LLC has <br />two separate treasurers listed, Eugene DiClaudio with a begin date of 3/6/98 and George S. <br />Davis with a begin date of 3/23/1998. Please clarify if these appointments are entered in the <br />system correctly. If not, please provide documentation regarding the proper information so it <br />can be updated. <br />Also, for Arch Western Resources LLC, [he system has two presidents listed, Robert W. <br />Shanks with a begin date of 6/28/98 and Jeffry N. Quinn with a begin date of 3/17/98. Please u, <br />clarify if these appointments aze entered correctly. If not, please provide documentation of [he D <br />proper information so it can be updated. <br />RULE 2.03.6 Right-of--Entry Information <br />A review of the right-of--entry shows that the portion of Section 9 comprising the "100-foot <br />buffer" described in the narrative description of the permit boundary (in Exhibit 2A) is not ~ <br />included. Please include in the right-of--entry infomration the documentation for that area north U <br />of the railroad right-of--way and north of the old highway right-of--way. <br />Also please correct the maps described as containing permit boundary information (maps 1, 53, `~ <br />