My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54285
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:35 PM
Creation date
11/23/2007 9:20:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
General Documents
Doc Date
9/17/2001
Doc Name
Proposed Decision & Findings of Compliance for PR1
From
Mountaintop Removal Operation
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />is necessary or desirable to ensure soil productivity consistent with the <br />post-mining land use (4.06.20 )). <br />B. The Division approves a variance from topsoil removal in accordance with Rule <br />4.06.2(2)(a). For those areas of the surface mine where the slopes exceed 50%, <br />the operator will not be required to strip topsoil. This is necessary due to the fact <br />that soil in these areas is of marginal quality and thickness, and equipment <br />limitations and safety considerations make topsoil salvage on slopes steeper than <br />50% highly undesirable. <br />C. The Division has determined selected overburden materials may be used for, or as <br />a supplement to topsoil. The resulting soil is equal to or better than the available <br />topsoil. This determination is based on physical and chemical analyses and <br />field-site trials approved by the Division (4.06.2(4)(a)). The applicant has <br />provided physical and chemical analysis in Exhibit 6. However, at the present <br />time, the applicant has committed to re-apply a minimum of .9 feet of topsoil over <br />all disturbed areas. Therefore, it is not likely that supplement materials will be <br />utilized given the present reclamation plan. <br />V. Sealing of Drilled Holes and Underground Openings <br />A. The applicant has not proposed to manage development, exploration, drill or bore <br />holes, wells or other exposed underground openings in a manner other than by <br />sealing and plugging. The Division does not approve any alternative methods of <br />managing openings. (4.07.1) <br />B. The Division will require that each hole, well or other underground opening be <br />capped, sealed, backfilled, or otherwise properly managed (4.07.3). <br />VI. Use of Explosives <br />A. The Division approves blasting at times other than those described in the blasting <br />schedule due to unavoidable hazardous situations. (4.08.3(2)(b)(v) and (4.08.4(2)) <br />B. Blasts will use more than 5 pounds of explosives or blasting agent. Public notices <br />of blasting schedules are proposed in accordance with Rule 4.08.3. Surface <br />blasting activities will be conducted by appropriate personnel possessing <br />appropriate Federal and State certitication. <br />C. Blasting will not be conducted within 500 feet of an active underground mine. <br />D. Signs will be posted and maintained in accordance with Rule 4.02. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.