My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54112
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:27 PM
Creation date
11/23/2007 9:13:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
9/25/1984
Doc Name
TR REQUEST PN CO-044-81
From
EMPIRE ENERGY CORP
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
crushed rock pads will be constructed for placement of the electrical <br />equipment. It is anticipated that a fence with locking gate will be <br />constructed around the pad. Also, secondary sediment control <br />structures, such as straw bales or silt fence, will be placed below the <br />substation site. This will be done to control sediment off of the site. <br />A light-use road will be constructed into the site as shown on Map <br />IV-15. The road will be approximately 20 feet wide into the site and a <br />turn around area will be provided for next to the pad. The top 3-6 <br />inches of soil will be salvaged and stockpiled for future reclamation <br />work. The soil from the pad and road preparation wi 11 be stockpiled in <br />the same stockpile. A 24" culvert will be placed in the collection <br />ditch (HR-D4) where the road crosses the ditch. A 24~" culvert will be <br />installed in the drainage next to the collection ditch. <br />During the soil salvaging process approximately 410 yd3 to 815 yd3 <br />of soil will be stockpiled for future use. The range of volumes shown <br />indicated the minimum and maximum amount of soil that can be salvaged. <br />The stockpile will be stabilized using the above seed mixture. <br />The location of the road meets the vertical and horizontal <br />alignment requirements, a review of the location of the road on Map <br />IV-15 clearly shows this. It is anticipated that the road will be <br />surfaced with crushed red rock. <br />A power line will be installed from the substation to the power <br />borehole. The poles will be installed along the line shown on Map IV-2. <br />A truck mounted auger will be used to bore the holes into which the <br />poles wi 11 be set. Trucks wi 11 be used to run the 1 i ne between the <br />(REV. 9/24/84) IV-44p <br />
The URL can be used to link to this page
Your browser does not support the video tag.