crushed rock pads will be constructed for placement of the electrical <br />equipment. It is anticipated that a fence with locking gate will be <br />constructed around the pad. Also, secondary sediment control <br />structures, such as straw bales or silt fence, will be placed below the <br />substation site. This will be done to control sediment off of the site. <br />A light-use road will be constructed into the site as shown on Map <br />IV-15. The road will be approximately 20 feet wide into the site and a <br />turn around area will be provided for next to the pad. The top 3-6 <br />inches of soil will be salvaged and stockpiled for future reclamation <br />work. The soil from the pad and road preparation wi 11 be stockpiled in <br />the same stockpile. A 24" culvert will be placed in the collection <br />ditch (HR-D4) where the road crosses the ditch. A 24~" culvert will be <br />installed in the drainage next to the collection ditch. <br />During the soil salvaging process approximately 410 yd3 to 815 yd3 <br />of soil will be stockpiled for future use. The range of volumes shown <br />indicated the minimum and maximum amount of soil that can be salvaged. <br />The stockpile will be stabilized using the above seed mixture. <br />The location of the road meets the vertical and horizontal <br />alignment requirements, a review of the location of the road on Map <br />IV-15 clearly shows this. It is anticipated that the road will be <br />surfaced with crushed red rock. <br />A power line will be installed from the substation to the power <br />borehole. The poles will be installed along the line shown on Map IV-2. <br />A truck mounted auger will be used to bore the holes into which the <br />poles wi 11 be set. Trucks wi 11 be used to run the 1 i ne between the <br />(REV. 9/24/84) IV-44p <br />