Laserfiche WebLink
0 <br /> Wastewater Treatment Ponds <br /> Please submit SGM's design information for the waste water <br /> treatment ponds in cross-section and plan view. Bond re- <br /> calculation requires volume information which will be obtained <br /> from this information. Certification for this facility is <br /> adequate. <br /> Pond E (Fish Creek Tipple) <br /> Adequate design information presently exists in the Foidel <br /> Creek mine permit. Certification which specifically references <br /> this design is required. <br /> EMD dewateringoonds <br /> Design information for this facility is good and the ponds are <br /> not constructed at this time. The Division reminds TCC to <br /> submit an as-built certification as per the Policy Memorandum <br /> after completion of this facility and prior to it's use. <br /> Roads <br /> The Division reviewed road information from both the CYCC permit <br /> #C-81-071 as well as the Foidel Creek permit. As you may be aware, <br /> recent Rule changes were made with regard to road classification <br /> and certification. For the road segments listed below, each road <br /> needs to be clearly labeled on a map with some indication of the <br /> type of road (haul, access, light-use) as well as the extent of the <br /> road (start and end) . Permit text should also be included <br /> identifying the roads specifically and where they are shown in <br /> their entirety on a map. For all roads, this map should be <br /> according to the standards of Rule 2 .10. For those haul or access <br /> roads constructed prior to August 1, 1995, in lieu of P.E. as-built <br /> certification, Rules 4 .03 .1 (1) (d) (ii) or 4 .03 .2 (1) (f) (ii) apply <br /> respectively. Please review Rules 4 .03 .1 and 4 .03 .2 . <br /> Haulroad A <br /> Haulroad A runs from CR #27 to just east of Pond B and was <br /> originally permitted under CYCC #C-81-071 . Road design <br /> information needs to be incorporated into the Foidel Creek mine <br /> permit. This haulroad will need a relevant showing as <br /> described by Rule 4 .03 .1 (1) (d) (ii) . <br /> Haulroad B <br /> This section of road runs from the shop/warehouse area to just <br /> east of Tipple #2 . It is presently bi-sected by the overland <br /> conveyor. Road design information needs to be incorporated <br /> into the Foidel Creek mine permit. This haulroad will need a <br /> relevant showing as described by Rule 4 .03 .1 (1) (d) (ii) . <br /> -13- <br />