<br />• 75.370 VENTILATION PLAN ADDENDUM <br />General: <br />The ventilation shaft will be installed in the North Mains <br />area at Crosscut #1, in the "0" Entry. The shaft will have a <br />16-foot finished diameter. Following the completion of the <br />shaft, the air courses (Intakes) will be examined for "dead" <br />areas and corrective action taken to eliminate any that may <br />occur. All air from the pilot hole will be vented to the <br />return. <br />Zn order to assure ventilation during the raise boring, one <br />il" diameter hole will be drilled outside of the 11" raise <br />bore pilot hole. The 11" pilot hole will in-gas to the mine <br />and the 11" additional drillhole will have blowing ventilation <br />to the cutting face as shown on Figure 8 (ventilation during <br />raiseboring process). <br />Preparation: <br />During the development of the approaches to the shaft bottom <br />area, the ventilation will be directed and regulated to the #1 <br />Entry air split and directed to the return at the end of that <br />split. No air will be allowed to enter the main intake air <br />course. The minimum required air quantity will be used so that <br />face operations wild not be affected. <br />Shaft Excavation: <br />During excavation of the shaft bottom and shaft, the <br />ventilation will be directed and regulated to the #1 Entry <br />split on to the return. A minimum air quantity of 20,000 CFM <br />will be used to ventilate the shaft bottom. This air will be <br />measured in Crosscut #1, between #0 Entry and #1 Entry to <br />assure that the minimum is available at the shaft bottom. <br />Additional air may be entering the project site that is <br />directed immediately down #1 Entry. <br />The methane content will be monitored during the excavation of <br />the shaft at the bottom of the shaft at a safe location <br />downwind and within 1 foot of the drill steel at the top of <br />the hole prior to start-up of the raise-bore machine and at <br />-''20-minute intervals while the raise-bore machine is in <br />operation. Since methane is not anticipated, if the methane <br />1 content exceeds 0.55 in the affected air course at the bottom <br />3 <br />AFPRUVED CMS & H ~ ~ ~ P 2 4'95 <br />t <br />