Laserfiche WebLink
combined with a permit revision application on June 25, 2002. The application was submitted as <br />both a renewal and a revision since Trapper was proposing the next five-yeaz mining plan and <br />was proposing to change orientation of the pits from anorth-south direction to an east-west <br />direction. The application was found complete on July 3, 2002. Discussion with OSM <br />determined that the application did not initiate amine-plan action. The proposed 5-yeaz mine <br />plan had already been included in the federal mine plan and all required leases had previously <br />been obtained. The Division sent preliminazy adequacy review question to Trapper on August <br />29, 2002. Trapper submitted information regazding reclamation liability estimates on November <br />4, 2002. Trapper supplied responses to the Divisions preliminary adequacy questions on <br />December 18, 2002. The Division sent a second set of adequacy questions to Trapper on January <br />10, 2003. The Division met with representatives of Trapper Mine on April 3, 2003 to discuss <br />remaining adequacy concerns. Trapper submitted fmal adequacy responses on May 29, 2003. <br />The Division reviewed the final adequacy responses and proposed to approve the renewal and <br />revision application on June 30, 2003. <br />Revisions to the Permit <br />Minor Revisions and Technical Revisions which have been made to the Trapper Mine permit <br />since the last renewal (RN03/PR-04) aze listed below. <br />Minor Revisions: <br />Revision No. Apuroval date Nature of revision <br /> <br />MR162 5/15/1998 Haulroad certifications <br />MR163 5/15/1998 Topsoil Pile A94-4 Relocation <br />MR164 7/31/1998 West Flume Dam Certification <br />MR165 7/31/1998 Temporary Diversion of No Name Drainage <br />MR166 11/16/1998 Utility Waste Cover Depth <br />MR167 2/02/1999 Utility Waste Update <br />MR168 3/08/1999 Middle Flume Pond #3 As-Built Certification <br />MR169 3/02/1999 Shrub Pad Success Standard <br />MR170 3/10/1999 North A Haul Road Certifications <br />MR171 5/12/1999 SPCC Plan Update <br />MR172 8/18/1999 Update Culvert List and Map <br />MR173 10/04/1999 Extension of ST-17 <br />MR174 12/22/1999 Second Extension of ST-17 <br />MR175 2/28/2000 As-built Certifications-Middle Flume Pond #1 and East <br /> Middle Flume Pond #1 <br />MR176 3/01/2000 Third Extension of ST-17 <br />MR177 7/10/2000 East F Pit Timing Revision <br />MR178 12/21/2000 Horse Gulch Pond #1 and East Flume Gulch Pond #1 As- <br /> Built Certifications <br />MR179 3/05/2001 G Pit Timing Revision <br />MR180 8/02/2001 SAE Elimination and Topsoil Pile D87-1 Abandonment <br /> <br />Trapper Mine 7 June 30, 2003 <br />